Laserfiche WebLink
~AMCON <br />DESIGN/BUILD I CONSTRUCTION MANAGEMENT I GENERAL CONTRACTING <br />January 28, 2008 <br />Mr. Jeremy Barnhart, Planning Manager <br />City of Elk River <br />13065 Orono Pkwy <br />Ells River, MN 55330 <br />Re: Great River Energy <br />Dear Mr. Barnhart: <br />Amcon Construction is proposing to build a 43,000 square foot combination office, <br />gazage, and high bay garage area facility on Great River Energy's exisfing campus in Elk <br />River. The construction process will include the demolition of an existing high bay <br />garage area, parking area, and office area. The proposed site will result in a net gain of <br />(1) one parking stall. There are no proposed signs for this building other than door and <br />parking signage. There are no plans for any building screening. <br />The new facility will be constructed with 12" insulated Fabcon precast panels matching <br />the style and color ofthe wazehouse/garage/office facility built on this campus in 2005. <br />The roof lines will vary in height was the tallest wall panel at 34' which is the same <br />height as the 2005 project. <br />Great River Energy will have 31 employees using this facility during normal working <br />hours. <br />Should you have any questions or comments, I can be reached at 952-200-4740. <br />Regards, <br />AMC CONSTRUC ON COMPANY <br />a utson <br />Project Manager <br />1715 Yankee Doodle Road, Suite 200 I Eagan, Minnesota 55121-1616 I TeL 651.379.9090 ~ Fax: 651.379.9091 <br />Email custserv@amconconstruction.com I Website: www.amco nco nstru ction.com <br />