Laserfiche WebLink
City of <br />El .-- REQUEST FOR ACTION <br />River <br />To Item Number <br />Plannin Commission 5.1 <br />Agenda Section Meeting Date Prepared by <br />Planning Items March 11, 2008 SheIla Cartney, Senior Planner <br />Item Description Reviewed by <br />Request by Great River Energy fox a building addition case# erem Barnhart, Plaiuvn Mana x <br />CU 08-OS Reviewed by <br />Action Requested <br />Staff recommends that the Planning Commission recommend approval of the Conditional Use <br />Permit fox a building replacement, as illustrated on drawings dated received February 26, 2008, with <br />the following conditions: <br />1. All comments of the City Engineer's memo dated February 27, 2008 shall be <br />addressed. <br />2. As a Conditional Use Permit is not a Building Permit, the applicant shall apply for all <br />require permits. <br />3. A NPDES permit is required prior to final approval of construction drawings. <br />4. Parking lot landscape be installed as illustrated. <br />5. Any trees removed for the fire lane shall be replaced on site. <br />Background/Discussion <br />Amcon Construction is proposing to replace an existing high bay garage area, parking area, and office <br />area, with a 43,000 square foot building of the same nature. This is an update fox Great River Energy's <br />campus in Elk River. <br />Attachments <br />Location Map <br />• Memo from City Engineer dated February 27, 2008. <br />Applicant's Narrative <br />Site Plan(s) dated received February 26, 2008 <br />Architectural Drawing(s) dated received February 26, 2008 <br />