My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 03-11-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
03-11-2008
>
5.1. PCSR 03-11-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2008 8:58:55 AM
Creation date
3/14/2008 8:55:55 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/11/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~AMCON <br />DESIGN/BUILD I CONSTRUCTION MANAGEMENT I GENERAL CONTRACTING <br />January 28, 2008 <br />Mr. Jeremy Barnhart, Planning Manager <br />City of Elk River <br />13065 Orono Pkwy <br />Elk River, MN 55330 <br />Re: Great River Energy <br />Dear Mr. Barnhart: <br />Amcon Construction is proposing to build a 43,000 square foot combination office, <br />garage, and high bay garage area facility on Great River Energy's existing campus in Elk <br />River. The construction process will include the demolition of an existing high bay <br />garage area, parking area, and office area. The proposed site will result in a net gain of <br />(1) one parking stall. There are no proposed signs for this building other than door and <br />parking signage. There are no plans for any building screening. <br />The new facility will be constructed with 12" insulated Fabcon precast panels matching <br />the style and color of the warehouse/garage/office facility built on this campus in 2005. <br />The roof lines will vary in height was the tallest wall panel at 34' which is the same <br />height as the 2005 project. <br />Great River Energy will have 31 employees using this facility during normal working <br />hours. - <br />Should you have any questions or comments, I can be reached at 952-200-4740. <br />Regards, <br />AMC CONSTRUC .ON COMPANY <br />a utson <br />Project Manager <br />1715 Yankee Doodle Road, Suite 200 I Eagan, Minnesota 55121-1616 I Tel: 651.379.9090 ~ Fax: 651.379.9091 <br />Email: custserv@amconconstruction.com I Website: www.amconconstruction.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.