My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 02-19-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
02-19-2008
>
7.1. SR 02-19-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2008 2:22:20 PM
Creation date
2/15/2008 2:22:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope, Timeline, and Fee information for the Actuarial <br />Valuation under GASB Statement No. 45 <br />City of Elk River <br />This timeline (and fee quote on page 13) assumes that the City of Elk River has <br />approximately 130 Plan Members with revenue as determined for GASB No. 34 <br />between $10 and $100 million. <br />GASB Statement No. 45 says that plans with less than 200 plan members must <br />perform an actuarial valuation at least every three years. <br />Upon receipt of all data needed for the project (see the Data Request), the <br />preliminary actuarial valuation results can be prepared within six to eight weeks. <br />After the preliminary results have been discussed, the final actuarial report can be <br />completed within two weeks. Any additional information requested (for example, <br />changes in plan design, actuarial cost projections) could possibly extend this <br />timeline. <br />Hildi Incorporated 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.