Laserfiche WebLink
Planning Commission Minutes <br />August 8, 2006 <br />--------------------------- <br />Page 9 <br />4. SOIL CORRECTION BE COMPLETED AS PER REBECCA HAUG'S MEMO <br />DATED AUGUST 3, 2006 <br />5. LIGHTING PLAN BE PROVIDED, INCLUDING <br />A. LIGHTING PLAN BE PROVIDED ,INCLUDING PHOTOMETRIC <br />PLAN BE PREPARED TO VERIFY NO MORE THAN'/z CANDLE <br />LIGHT SPILLING AT GROUND LEVEL ONTO ADJACENT <br />PROPERTIES <br />B. LIGHTS BE OF A CUTOFF DESIGN AND NO MORE THAN 30 <br />FEET ABOVE GRADE. <br />6. CONCRETE EDGING SHALL BE PROVIDED ON THE NORTH SIDE OF <br />THE NORTH PARKING LOT <br />7. PUBLIC RIGHT-OF-WAY OR EASEMENT FOR STREET, UTUILITY AND <br />DRAINAGE PRUPOSES ACROSS THE PROEPRTY FROM EAST TO WEST <br />AT THE 186TH AVENUE ALIGNMENT SHALL BE PROVIDED. <br />MOTION CARRIED 6-0. <br />5.4. Request by Kalway Construction on Behalf of Waste Management for a Conditional Use <br />Permit to Construct Office/Garage Public Hearing -Case No CU 06-22 <br />Kalway Construction, on behalf of Waste Management, requests a conditional use permit to <br />construct a 6,400 square foot building to house office and a garage and the Elk River <br />Landfill, 22460 Highway 169. Mr. Barnhart noted that reduced size drawing are not <br />available for the Commission, but that staff has reviewed full-size plans. He reviewed the <br />location, construction materials, parking, access, and landscaping issues associated with the <br />request. Mr. Barnhart noted this building will replace a previous structure which was <br />damaged by flooding, and that the existing red metal garage building will also be removed. <br />He explained that the proposed building location straddles two parcels, and staff <br />recommends the property line be adjusted or removed to correct this situation. Mr. <br />Barnhart further reviewed the conditions recommended by staff for approval of the request. <br />Chair Lemke opened the public hearing. There being no public comment, Chair Lemke <br />closed the public hearing. <br />Commissioner Anderson stated that he did not disagree the overall impact of the new <br />building would be an improvement. He stated he would like to see the Fire Department's <br />comments on the issue. He stated he was not in favor of recommending approval, due to <br />lack of information and reduced size drawings. Mr. Barnhart stated that staff has reviewed <br />the drawings and the Fire Chief had no concerns with the request. <br />Commissioner Offerman stated that in consideration of the size of the project, he could <br />support the request as presented by staff. <br />MOTION BY COMMISSIONER OFFERMAN, SECONDED BY <br />COMMISSIONER WESTGAARD TO RECOMMEND APPROVAL OF THE <br />REQUEST BY KALWAY CONSTRUCTION ON BEHALF OF WASTE <br />MANAGEMENT FOR A CONDITIONAL USE PERMIT TO CONSTRUCT A <br />6,400 SQUARE FOOT BUILDING TO HOUSE OFFICES AND A GARAGE, <br />CASE NO. CU 06-21, WITH THE FOLLOWING CONDITIONS: <br />