Laserfiche WebLink
a. Water and sanitary sewer trunk fees. Water and Sewer Trunk fees shall be paid at the <br />time the Final Plat is released for recording. This fee shall be at the rate applicable at <br />the time the final plat is released. <br />b. A Surface water management fee shall be paid at the time the Final Plat is released <br />for recording. <br />4. Park dedication shall be provided in the following manner: <br />a. Two (lots) multiplied by the park dedication fee established at the time the Final Plat <br />is released (currently $3,300). <br />5. All required subdivision/park information shall be provided in an electronic format (.dwg <br />file) as required by the City Ordinance and Land Use Application prior to recording of the <br />plat. <br />6. In addition to the easements shown on the preliminary plat, the following easements shall be <br />provided: <br />A. 10' Trail easement along the southern edge of the plat, adjacent to County right-of- <br />way. <br />B. A 25 foot easement along the access drive for lot 2, texrninating at lot 3. <br />7. If required, a NPDES permit shall be completed prior to final approval of construction <br />drawings. <br />8. A wetland buffer of 25 feet apply to all wetlands and a structure setback of 20 feet from the <br />buffer applies. <br />Respectfully Submitted <br />~M~~~ <br />eremy rnhart, AICP <br />Planning Manager <br />