My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 01-22-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
01-22-2008
>
6.1. SR 01-22-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2008 2:33:08 PM
Creation date
1/18/2008 11:04:24 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/22/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File: CU 08-01 Kevin Meland IUP <br />Page 2 City of Elk River <br />Attachments <br />• Memo dated November 25, 2007 from Kevin Meland <br />• Location Map <br />• a vicinity map; <br />• Certificate of Survey and project description map <br />• Application for Conditional Use Permit for Mineral Excavation by Kevin Meland dated <br />September 20, 2005; <br />• Letter of Approval from the Army Corps of Engineers <br />Action Requested <br />Approve an extension of an Interim Use Permit (CU 08-01) for Kevin Meland to mine 7.25 acres <br />(approximately 24,000 cubic yards of material), subject to the following conditions: <br />1. STAFF'S DECISION ON THE WCA IS NOT OVERTURNED ON AN <br />APPAL. <br />2. MR. MELAND RECEIVES APPROVAL FROM SHERBURNE COUNTY <br />PUBLIC WORKS TO ACCESS COUNTY ROAD 1 FOR HAULING. <br />3. ALL WORK IS COMPLETED WITHIN ONE (1) YEAR OF PROJECT <br />EXTENSION APPROVAL. <br />4. THE MAXIMUM DEPTH FOR THE PONDS IS SIX (6) FEET AND SLOPES <br />ARE A MAXIMUM OF 6 TO 1. <br />5. ALL SPOILS REMOVED FROM THE WETLAND ARE DEPOSITED ON <br />UPLAND AREAS. <br />Planning Commission Action Morton by Second by Vote <br />Follow Up <br />Overview <br />The applicant received an IUP in 2005. The mining was to be completed within 2 years, therefore, a <br />formal zoning amendment, CUP and license was not necessary. Currently, only a quarter of the <br />ponds have been excavated. <br />Applicable Regulations <br />Standards for Issuance of a Conditional/ Interim Use Permit (Section 30-654) <br />The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: <br />C:\Usexs\dhuebner\AppData\Local\Microsoft\Windows\Temporary Internet Files\OLK87E4\Staff report to PC.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.