Laserfiche WebLink
FROM~MA MORTENSON T0~ 441?425 MAY 19~ 1995 8~58AM P.04 <br />• <br />• <br />• <br />5119195 <br />~O~~HSOH EST.#95-046 <br />1hr.Gmsrnrtt;ortk~unr'mrr'a-'" ELK R1.VER ICE ARENA ADDlTlON <br />BUDGET COMPARISON <br /> <br />SPECIFICATION SECTION PRELIMINARY <br />BUDGET MORTENSON <br />BUDGET OIFF FROM <br />PRELIM BUD <br />1044 10440 INTERIOR SIGNAGE $ 1,000 $ 1,000 <br />1052 10522 FIRE EXTINGUISHERS/CABIN $ 2,163 $ 1,184 $ (979) <br />1080 10800 TOILET 8~ BA7H ACCESSORIES $ 3,634 $ 1,979 $ {1,655} <br />1276 12760 BLEACHERS $ _ g _ <br />1317 13170 ICE RINK SYSTEMS $ 433,365 $ 349,450 $ {83,915) <br />1500 15000 MECHANICAL $ 277,580 $ 190,074 $ (87,506) <br />1550 15500 FIRE PROTECTION $ 40,000 $ 38,824 $ (1,176) <br />1600 16000 ELECTRICAL $ 115,350 $ 114,141 $ {1,209) <br />100 01000 GENERAL CONDITIONS $ 195,433 $ 144,354 $ (51,079} <br /> SUBTOTAL S 2,362,73b 2,315,603 $ 47,132) <br /> $ - <br /> CONSTRUCTION MANAGER FEE $ 70,882 $ 80,709 $ 9,827 <br /> LIABILITY INSURANC $ 12,168 $ 17,752 $ .5,584 <br /> SUBTOTAL -CONSTRUCTION COSTS 2,445,785 $ 2,414,064 (31,721) <br /> <br /> SUBCONTRACTOR BONDS $ 32,600 $ 32,600 <br /> CONSTRUCTION CONTINGENCY $ 117,410 $ 117,410 <br /> DESIGNlCONSULTANT FEES 175,000 <br /> REFRIGERATION EQUIPMENT $ 60,000 $ 60,000 <br /> FIXED BLEACHERS $ 52,000 $ 52,000 <br /> RUBBER FLOORING $ 8,000 $ 8,000 <br /> BUILDERS RISK INSURANCE $ 5,000 $ 5,000 <br /> TOTAL 2,445,785 2,864,07 418,289 <br />Page 2 <br />