My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1.c SR 05-15-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
05-15-1995
>
5.1.c SR 05-15-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2007 9:56:19 AM
Creation date
12/21/2007 9:56:19 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/15/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO. 3 <br />ORONO ROAD REALIGNMENT <br />CITY OF ELK RIVER, MINNESOTA <br />• <br />ITEM <br />j 'NO. DESCRIPTION ' UNIT. QTY. UNIT TOTAL <br />~; <br />~ PRICE PRICE <br /> SCHEDULE 17.0 ORONO ROAD -STREET AND STORM SEWER ADDITIONS <br />1 12" RCP CLASS 5 LF 208 17.00 3,536.00 <br />2 15" RCP CLASS 5 LF 52 18.00 936.00 <br />3 18" RCP CLASS 5 LF 384 19.00 7,296.00 <br />4 12" RCP FLARED END SECTION EA 1 500.00 500.00 <br />5 18" RCP FLARED END SECTION EA 1 600.00 600.00 <br />6 48" DIAMETER MANHOLE EA 2 1,100.00 2,200.00 <br />7 RIP RAP, CLASS III CY 5.7 35.00 199.50 <br />8 CATCH BASIN 2' x 3' EA 2 750.00 1,500.00 <br />9 SUBGRADE PREPARATION RDSTA 8.6 100.00 860.00 <br />•10 CLASS 5 AGGREGATE BASE TN 1800 4.54 8,172.00 <br />11 TYPE 31B BITUMINOUS BASE COURSE TN 600 15.83 9,498.00 <br />12 TYPE 41A BITUMINOUS WEAR COURSE TN 670 18.77 12,575.90 <br />13 TACK COAT GAL 245 1.00 245.00 <br />14 CONCRETE CURB & GUTTER, B618 LF 2055 4.50 9,247.50 <br />15 CONCRETE MEDIAN SY 150 20.00 3,000.00 <br />16 SEEDING ACRE 0.3 500.00 .150.00 <br />17 SODDING, LAWN TYPE SY 1615 1.30 2,099.50 <br />18 4" EQUIVALENT WIDTH STRIPING LF 1335 0.32 427.20 <br />19 MEDIAN TAPER EA 1 300.00 300.00 <br />20 VALLEY GUTTER SF 120 5.00 600.00 <br />21 TRIANGULAR VALLEY GUTTER EA 2 400.00 800.00 <br />22 4" RSC @ 36" DEPTH LF 75 6.00 450.00 <br />T SCHEDULE 18.0 ORONO ROAD -STREET AND STORM SEWER ADDITIONS 65,192.60 <br />• <br />230223#1.WK4 230-259-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.