Laserfiche WebLink
• C. Burnable building materials from demolition of a <br />commercial or institutional structure (farm buildings are <br />not commercial). <br />D. Industrial solid waste generated from an industrial or <br />manufacturing process, or from a service or commercial <br />structure. <br />E. Motor vehicles or conduct salvage operations by open <br />burning; <br />F. Garbage from the handling, procession, storage, <br />preparation, serving, or consumption of food. <br />G. Painted or treated wood. <br />410.08 - SPECIAL OPEN BURN PERMIT <br />1. ~necial Open Burn Permit Required. A Special Open Burn <br />Permit is required for open burning in the following <br />circumstances: <br />A. Any open burning in a "no-burn" area of the City. <br />. B. Any person requesting to burn between the hours of <br />b-:--~A~8:00 a.m. and 6:00 p.m. when there is not more than <br />three (3) or more inches of snow cover. <br />2. Special Open Burn Permit Annlication Procedure <br />A. The applicant must contact the Fire Chief, or designee <br />of the Fire Chief, and schedule a preliminary site <br />inspection to locate the proposed burn site. <br />B. No burning shall take place without first having <br />obtained a Special Open Burn Permit. <br />C. The length of Special Burn Permit shall be determined <br />by the Fire Chief or designee of the Fire Chief. <br />D. ~necial Burn Permit Fee. The fees for Special Burn <br />Permits are as follows: <br />i. Residential Areas - $10.00 <br />ii. Development and/or clearing of land - $25.00 <br />iii. Daytime hour special burn permit - $25.00 <br />410 10 - REVOCATION OF OPEN BURNING PERMIT <br />4.11 <br />