Laserfiche WebLink
Mr. Steve Ach <br />• ; April 19, 1995 <br />Page Three <br />With our general knowledge of the storm sewer systems available in this area, we <br />believe that an adequate design can be presented for this piece of property to deal <br />with storm drainage issues for the type of development shown on the sketch plan. <br />During our review we have not attempted to analyze parking needs, which are shown on <br />the sketch plan. No topography is shown; therefore, no review of the proposed grading of <br />the site has been conducted. Nor are items such as signing or landscaping shown; <br />therefore, no review of these items has been prepared. <br />In summary, we believe that the general traffic and utility service for this site can be dealt <br />with adequately to support the type of commercial development shown on the sketch plan. <br />If you have any questions regarding any of these comments, please do not hesitate to call. <br />Sincerely, <br />MSA, CONSULTING ENGINEERS <br />Terry J. Maurer, P.E. <br />TJM:pd <br />267-1910.apr <br />• <br />