My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 03-06-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
03-06-1995
>
7.2. SR 03-06-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2007 2:23:39 PM
Creation date
12/20/2007 2:23:39 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/6/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Planning Commission Page 2 <br />February 28, 1995 <br />• Retrofitting the. existing ice arena to meet AD requirements <br />• Redesigning the entrance to both arenas including a common Iobby area <br />.for ticketing, concessions. and restroom facilities. <br />• Construct a 235 by 151 precast building for the new Olympic ice sheet. <br />• .Provide initial seating for approximately 900 spectators with the ability to <br />expand that seating to accommodate roughly 2,500 people. <br />• Provide new locker room space in both arenas along with a common <br />mezzanine level between the two ice sheets. <br />• Install new parking area to accommodate upwards of 90 vehicles. <br />• Provide on-site lighting within the parking area and around.. the ice arena. <br />• Install landscaping around the building and site perimeter. <br />• Repair a portion of the existing parking .lot in front of the current ice <br />arena to help facilitate drainage. <br />Analysis <br />The following are issues that have been discussed relative to the proposed ice <br />arena: <br />Parking -The existing ice arena can currently seat approximately 700 <br />people. The new ice arena will ultimately be able to seat roughly <br />2,500. In total, these two facilities operating at full capacity could <br />draw 3,200 spectators. Certainly this may be a rare occurrence where <br />both facilities are operating at optimum capacity, however, it is a <br />situation that could occur in the future. <br />In terms of designing the parking needs for a facility that is located <br />within a campus setting that has a variable amount of parking <br />opportunities available, the parking issue becomes slightly less critical <br />than an isolated parcel with limited parking ability. Similar to a <br />shopping center, parking- lots are not designed for the worse case (i.e. <br />Christmas Eve). Therefore, it is not anticipated that a parking area <br />will be provided to accommodate the optimum capacity. <br />With the. ice :arenas being located on the high school campus where <br />other events such as basketball, volleyball :and swimming may be <br />occurring at the same time as an event at the ice arena, there. may be <br />more pressures on the. demand for parking space. However, according <br />to the high school, scheduling events at alternative times has been <br />rather successful and therefore, parking problems have been <br />minimized. One of the key elements in managing these peak parking <br />demands will be the scheduling of events at alternate times to spread <br />those demands out and not having them occur at the same time. <br /> <br />s:planning:pc:cu95-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.