Laserfiche WebLink
Elk River City Council Minutes <br />June 21, 1993 <br />Page 13 <br />• - THE DRAINAGE PLAN BE APPROVED BY THE COUNTY AND, THE CITY <br />ENGINEER AT THE DEVELOPER'S EXPENSE. <br />- THE DEVELOPER WORK WITH THE COUNTY REGARDING A <br />REDISTRIBUTIONMENT AND POSSIBLE REDETERMINATION OF FUTURE <br />DITCH ASSESSMENTS ONTO THE INDIVIDUAL LOTS IN THE PLAT PRIOR <br />TO RECORDING IT. <br />- THE DEVELOPER IS RESPONSIBLE FOR WHATEVER IMPROVEMENTS ARE <br />NEEDED TO THE DITCH SYSTEM TO HANDLE THE DRAINAGE FROM THE <br />PLAT. <br />- THE DEVELOPER GRANTS THE COUNTY RIGHTS, IN A FORM DETERMINED <br />BY THE COUNTY, TO THE DITCH IN THE SOUTHEAST CORNER OF THE <br />PLAT (DITCH 31) PRIOR TO RECORDING. <br />4. OUTLOTS A AND B ARE DEDICATED TO THE CITY. <br />5. A DEVELOPMENT PLAN, ROAD PLAN, GRADING AND DRAINAGE PLAN BE <br />APPROVED BY THE CITY ENGINEER. <br />6. ALL SITE GRADING NEEDED TO ACCOMPLISH DRAINAGE IS DONE BY THE <br />DEVELOPER PRIOR TO CITY ACCEPTANCE OF THE IMPROVEMENTS IN THE PLAT. <br />7. THE DEVELOPER GAIN APPROVAL FROM UNITED POWER ASSOCIATION FOR THE <br />CONSTRUCTION OF THE ROAD WITHIN THEIR EASEMENT. <br />8. PARKS: <br />- THE WESTERN 40 ACRES OF MRS. BARNIER'S ORIGINAL 120 ACRES BE <br />DEDICATED AS PARK. <br />- A 20 FOOT WIDE TRAIL BETWEEN OUTLOT A AND OUTLOT B BE <br />DEDICATED. <br />- A 20 FOOT WIDE TRAIL BETWEEN LOT 21, BLOCK 1, AND LOT 6, <br />BLOCK 2, BE DEDICATED. <br />- SEVENTY FEET OF RIGHT-OF-WAY ON ELGIN COURT AND 195TH AVENUE, <br />BE DEDICATED TO ACCOMMODATE A TRAIL. <br />- A 20 FOOT WIDE TRAIL BETWEEN LOTS 4 & 5, BLOCK 3, BE <br />DEDICATED. <br />THE ABOVE LISTED STIPULATIONS ARE IN LIEU OF ALL PARK <br />DEDICATION FEES FOR THE FIRST AND SECOND PHASE OF THIS PLAT. <br />9. THE CITY ENGINEER DESIGNS THE SEWER AND WATER LINES FOR THIS PLAT. <br />10. THE DEVELOPER PROVIDES TEMPORARY EASEMENTS ACCEPTABLE TO THE CITY <br />ENGINEER FOR TEMPORARY TURNAROUNDS FOR ELGIN COURT ON THE NORTH <br />END OF THE PLAT AND ELGIN DRIVE ON THE SOUTH END OF THE PLAT PRIOR. <br />TO RECORDING. <br />11. IMPROVEMENTS IN THE PLAT ARE COMPLETED WITHIN ONE YEAR FOLLOWING <br />THE DATE OF FINAL PLAT APPROVAL. <br />12. PRIOR TO RECORDING THE PLAT, THE DEVELOPER PROVIDE THE CITY WITH A <br />LETTER OF CREDIT FOR 100 OF THE ESTIMATED COST OF THE <br />• IMPROVEMENTS IN THE PLAT, INCLUDING THE COST OF WETLAND <br />MITIGATION. FURTHER, THAT A 25~ WARRANTY BOND IS REQUIRED FOR A <br />ONE YEAR PERIOD FOLLOWING CITY ACCEPTANCE OF THE IMPROVEMENTS IN <br />THE PLAT . <br />