Laserfiche WebLink
r^ <br />230-216-30 <br /> RC SAFETY APRON ~ GRATE DES 3128 EA 1 650.00 650.00 <br />15 CONCRETE CURB & GUTTER, S518 LF 200 11.65 2,330.00 <br />16 CONCRETE CURB 8 GUTTER, 6618 LF 80 11.65 932.00 <br />17 CONCRETE VALLEY GUTTER SF 105 4.15 435.75 <br />18 TRIANGULAR VALLEY GUTTER SECTIONS EA 2 500,00 1,000.00 <br />19 4" CONC SIDEWALK SF .1290 2.30 2,967.00 <br />20 PEDESTRIAN CURB RAMP EA 6 150.00 900.00 <br />21 SEED AND MULCH AC 0.05 7500.00 375.00 <br />22 F& I SIGN PANELS, TYPE C SF 8 16.00 128.00 <br />23 ADJUST TRAFFIC SIGNALS EA 2 400.00 800.00 <br />T SCHEDULE 12.0 HWY 169 AND JACKSON AVE -CHANGE ORDER N0.3 -TOTAL $19,304.25 <br /> TOTAL CONSTRUCTION COST <br /> SCHEDULE 11.0 HOLT REALIGNMENT -CHANGE ORDER NO. 3 $46,555.81 <br /> SCHEDULE 12.0 HWY 169 AND JACKSON AVE -CHANGE ORDER NO. 3 $19,304.25 <br /> TOTAL $65,860.06 <br />i• <br />i• <br />