My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 03-20-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
03-20-1995
>
7.2. SR 03-20-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2007 9:41:54 AM
Creation date
12/18/2007 9:20:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mazch 20, 1995 <br />File: 230-216-30 <br />CONSULTlNC ~1GIN®tS <br />Honorable Mayor and City Council <br />1326 Energy Park Drive City of Elk River <br />sr. Poul, MN sslo8 13065 Orono Pazkway <br />612.644.4389 P.O. BOR 490 <br />1-eoo-eas-2923 Elk River, MN 55330 <br />fox:612-644-9446 <br />RE: ELK PARK CENTER IMPROVEMENTS <br />CHANGE ORDER NO. 3 <br />Dear Council Members: <br />As requested last fall, we have prepared a change order for the realignment of Holt Avenue <br />at the intersection of Jackson. This realignment will bring the road further west along the <br />boundary of the cemetery, which will then allow for full left turn movements at the <br />intersection with Jackson Avenue. <br />CML ENGINEERING We have also included iri the change order some construction activities iri the median cross- <br />ENVIRONMENTAL over of the Jackson/193rd intersection with TH 169. We have proposed t0 add these <br />~NICIPAL activities at this time since the urbanization of that median cross-over will be completed by <br />~.ANNING adding concrete islands where the center signal installations are, which will be fundable <br />SOIiD WASTE through the Municipal State Aid turnback monies. If this work is not completed now, we <br />STRUCTURAL may lose the opportunity for such funding. Therefore, we are recommending that Change <br />suevEYING Order No. 3 be considered at this time. <br />TRAFFIC <br />TRANSPORTATION The estimated cost of the realignment of Holt Avenue is $46,550.81. The construction <br />activities for the median cross-over are estimated at $19,304.25, for a total cost,of Change <br />ELECTRICAI/MECHANICAL <br />ENGINEERING: Order NO. 3 of $65,860.06. <br />HVAC <br />POWER DISTRIBUTION If you have any questions regazding this item, I will be in attendance at your March 20, <br />SCADA 1995, City Council meeting. <br />SYSTEM CONTROLS <br />Sincerely, <br />MSA, CONSULTING ENGINEERS <br />FFK:ES IN: <br />~INNEAPOUS <br />PRK~tLAKE <br />ST. PAUL <br />WASECA <br />~~ <br />c %~i~~r~ <br />~~~ / <br />Terry J. Maurer, P.E. <br />TJM:tw <br />Enclosure <br />2>irr2ol:o.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.