My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 12-17-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
12-17-2007
>
5.1. SR 12-17-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2007 11:24:58 AM
Creation date
12/14/2007 11:24:58 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk REQUEST FOR ACTION <br />~. <br />River <br />To <br />Ci Council Item Number <br />5.1. <br />Agenda Section <br />Public Works Meeting Date <br />December 17, 2007 Prepared by <br />Ter Maurer, Public Works Director <br />Item Description <br />Consider Resolution Accepting Bid and Authorizing Execution Reviewed by <br />Lori ohnson, Ci Administrator <br /> <br />of Contract in the Matter of the Wastewater Treatment Plant Reviewed by <br />Phase II Improvement <br />Action Requested <br />Adoption of the attached resolution accepting the bid of Gridor Construction, Inc. and authorizing the <br />execution of the contract for the Wastewater Treatment Plant Phase II Improvement. <br />Background/Discussion <br />In August, the City Council authorized plans for the Phase II Improvements at the W~UTP. The major <br />components of the project include a new building with a mercury reduction filter, a new garage stall to <br />house the existing jet truck, replacement of the ultraviolet treatment equipment and standby generation to <br />run the entire plant, along with other minor miscellaneous improvements. The original estimate including <br />a 15 percent contingency was $4.3 million. The low bid received by Gridor Construction, Inc. was <br />$3,594,700. There were a total of nine bids received. The following table lists the bidders and the total <br />bid amount. <br />Bidder Amount <br />Gridor Construction, Inc. $3,594,700 <br />ohn T. ones Construction Co. 3,610,000 <br />Ma ne Construction, Inc. 3,689,600 <br />Rice Lake Construction 3,764,000 <br />Sheeh Construction Com an 3,833,300 <br />Munici al Builders, Inc. 3,840,660 <br />Staab Construction Co oration 3,843,000 <br />Madsen- ohnson Co oration 4,028,600 <br />Knutson Construction 4,245,000 <br />Gridor Construction, Inc. has previously successfully completed two major projects at our Wastewater <br />Treatment Plant. Therefore, we are prepared to recommend award to them as the lowest responsible <br />bidder. <br />Financial Impact <br />The total project cost including engineering (approximately $680,000) and project contingency ($180,000) <br />is $4,454,700 (excluding yet to be determined building permit cost). The total project cost will be funded <br />by existing sewer reserves which have been accumulated over the years from Sewer Availability Charges <br />(SAC) payments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.