My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 11-19-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
11/19/2007
>
6.3. SR 11-19-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:11 AM
Creation date
11/16/2007 10:50:37 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/19/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 12, 2007 <br />Michael Caron <br />Tiller Corporation <br />PO Box 1480 <br />Maple Grove MN 55311-6480 <br />RE: REQUEST FOR CONDITIONAL USE PERMIT FOR MINERAL <br />EXCAVATION, CASE NO. CU 07-22 <br />Dear Mt. Caton: <br />Your request as described above was approved by the Elk River City Council at their August <br />20, 2007 meeting. Conditions of approval are as follows: <br />1. TRAFFIC FROM THE OPERATIONS AREA WILL ACCESS THE NEW <br />ALIGNMENT OF COUNTY RD 33 WITH THE MAJORITY OF TRAFFIC <br />GENERATED FROM THE EXISTING OPERATION AREA HEAD EAST TO US <br />HWY 169. PROCTOR RD AND COUNTY RD 33 WEST OF THE EXITING <br />OPERATION WILL ONLY BE USED FOR LOCAL PROJECTS. <br />2. THE SITE MUST OPERATE UNDER MINNESOTA POLLUTION. CONTROL <br />AGENCY (MPCA) NPDES PERMIT FOR GRAVEL MINING FACILITIES AND A <br />STORMWATER POLLUTION PREVENTION PLAN BE IMPLEMENTED. <br />3. WATERING ON-SITE GRAVEL HAUL ROADS MUST BE DONE TO REDUCE <br />DUST. <br />4. ALONG PROCTOR RD, A 78 FOOT SETBACK MUST BE MAINTAINED AND IN <br />NO INSTANCE WILL THE SETBACK BE LESS THAN 78 FEET FROM RIGHT- <br />OF-WAY. <br />5. THE OPERATOR SHALL TAKE MEASURES DEEMED APPROPRIATE BY THE <br />SHERBURNE COUNTY FORESTER TO CONTROL OAKWILT. CUTTING OF <br />TREES BETWEEN APRIL IS AND JULY 15 IS PROHIBITED. <br />6. THE SITE MUST BE GRADED IN ACCORDANCE TO THE RECLAMATION <br />PLAN. <br />7. OPERATIONS MUST BE IN COMPLIANCE WITH ALL STATE NOISE <br />STANDARDS. <br />8. MINING AND CRUSHING WILL BE CONDUCTED BETWEEN 7:00 A.M. TO 7:00 <br />P.M. MONDAY -FRIDAY AND 8:00 A.M. TO 4:30 P.M ON SATURDAY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.