Laserfiche WebLink
<br />INPEPENDENT <br />CONSUL TING <br />_ENGINEERS, INC. <br /> <br />80 W. County Road C <br />Little Canada <br />St. Paul, Minnesota 55117 <br />Suite 801 <br /> <br />Bradford A. Lemberg, P.E., President <br /> <br />PHONE: 612-482-9313 <br />FAX: 612-482-9558 <br /> <br />MEMO <br /> <br />Project No. 230294 <br /> <br />TO: <br />FROM: <br />DATE: <br /> <br />Elk River Ice Arena Task Force <br />Brad Lemberg <br />January 5, 1995 <br /> <br />The attached listing of Opinion of probable Cost for the <br />Elk River Arena Expansion project is made up a a prelimi- <br />nary opinion based on the schematic drawings. <br /> <br />The anticipated total cost of the the "finished" arena <br />including all fees etc. is $2,448,289, as shown on the <br />attached statement of Probable Construction Costs. <br /> <br />e <br /> <br />possible deducts as listed are in the amount of $476,500. <br />There are only some of the costs that may be deducted as a <br />part of the first phase of the project. Other possible <br />deducts are to omit the glass and frames for windows, <br />delete some of the rubber flooring and obtain used belting <br />from a gravel pit or other source, hold expansion of the <br />lobby public toilet area until second phase and several <br />others. <br /> <br />By deleting the items shown and priced the opinion of the <br />project cost is $1,971,789. This is $171,789 over the <br />budget of $1,800.000. <br /> <br />with help from the Hockey Association, donations and <br />possible fundraisers and also reduced prices from local <br />contractors this budget should be very easily met. <br /> <br />The cost shown herein are preliminary in nature and will <br />be revised at the time the plans are more detailed. <br /> <br />It is recommended that the City Councel authorize the <br />design team to proceed with the preparation of construc- <br />tion documents. <br /> <br />e <br />