Laserfiche WebLink
<br />e page 4 <br />Div.16 <br /> <br />Electrical <br />16000 Electrical work <br />16100 Demolition(in 2060) <br />16200 Basic electrical systems <br />16300 Main service <br />16400 Power wiring <br />16700 Special systems <br /> <br />76,917 <br />o <br />40,522 <br />22,200 <br />15,950 <br />2,000 <br /> <br />Total electrical $157,589 <br /> <br />project contingency $150,000 <br /> <br />Total construction cost $2,299,789 <br /> <br />professional fees 138,500 <br /> <br />3,000 <br />7,000 <br /> <br />Special engineering reports-civil <br />soil <br /> <br />Total probable project cost <br /> <br />Project Notes: <br /> <br />e 1. <br /> <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br /> <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br /> <br />. <br /> <br />Section 13162 ice rink floor - price includes <br />concrete floor - if sand floor is acceptable <br />Parking area paid by city or school <br />If utility lines installation by school <br />Omit stacking bleachers at this time <br />Omit fixed bleachers at this time <br />Delete interior painting for now <br />Omit toilets in team. rooms for now <br />and build only 2 locker rooms per program <br />Omit running track <br />omit corner storage rooms <br />Omit curbing in parking lot <br />Omit painting of exterior <br />Omit new entry vestibule/office/ticket room <br />Omit remodel of concession/rental office <br />Landscaping <br />Omit chain link fence <br /> <br />possible deduct total <br /> <br />possible Phase I Cost <br /> <br />$2,448,289 <br /> <br />refrigeration <br />deduct $50,000 <br />deduct 30,000 <br />deduct 14,000 <br />deduct 96,000 <br />deduct 99,000 <br />deduct 10,000 <br />deduct 28,000 <br /> <br />deduct <br />deduct <br />deduct <br />deduct <br />deduct <br />deduct <br />deduct <br />deduct <br /> <br />55,000 <br />18,000 <br />12,000 <br />4,000 <br />38,000 <br />10,000 <br />8,500 <br />3,000 <br /> <br />$476,500 <br /> <br />$1,971,789.00 <br />