Laserfiche WebLink
REQUEST FOR ACTION <br />To Item Number <br />Ci Council 6.5. <br />Agenda Section Meeting Date Prepared by <br />Communi ~ Develo went October 15, 2007 crew Barnhart, Plannin b4ana er <br />Item Description Reviewed by <br />Request by Stonewoxks Architectural Precast fox Conditional <br />Use Permit -Case No. CU 07-25, continued from September Reviewed by <br />17, 2007 <br />Action Requested <br />Approval for the Conditional Use Permit memorializing the operations parameters: <br />1. Hours: general operation 6a to 6p, 7 days per week. <br />2. Hours: outside operation 7a to 6p M-F, 8a to Sp Saturday, 12p to Sp Sunday. <br />3. Outside operation to include cutting, sandblasting, power cvashing. <br />4. Construction of an 8' high berm along the north and east property line. <br />5. Construction of a 30' x 50' four sided fabric building north of the existing production <br />building. The overhead access door would face the south. <br />And subject to 2 conditions: <br />1. Payment of application and review fees <br />2. All other conditions as previously imposed: <br />a) The existing access from Flighway 169 can not be utilized by this facility. The proposed <br />connection to the existing driveway shall be eliminated from the site plan. <br />b) All comments of the City Engineee shall be addressed. <br />c) The existing residence be allowed to remain provided that the occupants axe employees of <br />Plaistcd Companies ox JT Land Company and their job is that of caretaker of the mining pit <br />and ox production facility. <br />d) Screening shall be provided along the east property line, between the facility and the adjacent <br />residence. <br />e) Downcast building lights only, no other site lighting is allowed. <br />Summary <br />At its meeting on September 17, 2007 the City CouncIl provided direction to staff and the applicant to <br />address concerns raised by adjacent property owners relative to the outdoor sandblasting, cutting, and <br />other processes. The applicant, Stonewoxks, requested four weeks to evaluate options and prepare a <br />response fox the Councils review, recognizing that there are concerns related to the sandblastuig <br />operation in addition to the akeady understood noise and hours of operation concerns. Their proposal <br />includes bexming and construction of a building. '1"hese two additions, they believe, will address the noise <br />and dust issues associated with the operation of the business, while not being too disruptive to their <br />business flow. <br />S:\PLANNING\Case Piles\CUP\CU 07-25 JT Land Co-Stonewoxks\Action mquested-CC 10-]S07.doc <br />