My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 10-15-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
10/15/2007
>
7.1. SR 10-15-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:08 AM
Creation date
10/12/2007 9:37:00 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/15/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />Ma rox and Ci CouncIl 7.1. <br />Agenda Section Meeting Date Prepared by <br />Public Works October 15, 2007 Tet Maurer, Public Works Director <br />Item Description. Reviewed by <br />Consider Resolution Ordering the Preparation of Plans and Loxi ohnson, Cit Administrator <br />Specifications in the Matter of the Downtown Overlay and Reviewed by <br />Intersection Geometric Improvement of 2008 <br />Action Requested <br />Adoption of the attached resolution authorizing the preparation of plans and specifications fox the <br />Downtown Overlay and Geometric Improvements. <br />Background/Discussion <br />As directed by the Ciry Council, I have held two informational meetings concerning the proposed <br />geometric improvements to the Main Street/Jackson Avenue intersection. The first was held on Monday, <br />August 27"' at 3:30 p.m. and the second was held on Tuesday, August 28~' at 8:00 a.m. Attached is a <br />memo I prepared to the City Administrator dated August 30, 2007, describing those two informational <br />meetings. I also met with the Rivers Edge Group on Wednesday, October 10, 2007. The general tone of <br />those in attendance at the Rivers Edge Group was supportive of the full intersection improvement. They <br />thought it would make the downtown area much more pedestrian friendly; however, they were concerned <br />about maintenance of traffic during the period of the intersection closure. The information I provided to <br />them showed a more detailed wank plan with a shutdown of the intersection of 12 days, starting on <br />Monday of the first week and opening back up by the Friday of the second week, so that only one <br />weekend would be impacted. <br />Fox your information also attached are e-mails I received from Wendy Simenson and Patty Hipsag <br />regarding the proposed improvements. <br />Financial Impact <br />The total project cost including the overlay and geometric improvements is estimated at $430,000. The <br />proposed 2008 Streets Capital Improvement Plan (CIP) has $350,000 programmed fox this project. The <br />CIP would need to be changed to provide additional funding fox this increased cost. <br />Attachments <br />• Resolution Authorizing Preparation of Plans and Specifications <br />• August 30, 2007 memo to Loxi Johnson, Ciry Administrator <br />• Patty Hipsag e-mail <br />• Wendy Simenson e-mail <br />• Proposed Geometric Layout (from August 13, 2007 presentation) <br />• Proposed Overlay Axea (from August 13, 2007 presentation) <br />Action blohon by Second 6y Vo[e <br />
The URL can be used to link to this page
Your browser does not support the video tag.