Laserfiche WebLink
COMPOST: <br />Loader 1 <br />^ Available to push up grass/leaves and brush drop off- average 2 hours/week <br />Loader 2 <br />^ Used with grapple bucket to feed contract brush chipper 3 or 4 times per year and <br />used to load processed brush and leaves/grass clippings for transport to compost <br />site <br />Loader 3 <br />• Used with grapple bucket to feed contract brush chipper 3 or 4 times per year and <br />used to load finished compost to haul back for residents to pick up. AIso used to <br />feed screen plant to processfmished compost. <br />Note: <br />Two loaders are needed when the contractor is on site chipping the brush. Loader <br />number 1 has the fewest hours committed to composting, but serves the Park and Streets <br />Division needs while loader 2 & 3 are occupied with composting and other jobs. <br />STREETS: <br />Loader 1 <br />^ This loader serves as the `hard" machine, when loaders 2 8c 3 are out on projects. <br />This loader loads topsoil, class 5, or mck for Streets, Pazk and other departments. <br />This loader also is used by Fleet Maintenance with the forks for loading and <br />unloading pallets or as a boom for heavy lifts, since the shop does not have an <br />overhead hoist. <br />Loader 2 <br />• Is used to load, carry and spread materials for street repair and storm water <br />projects. Also used with the grapple bucket to pick up brush and trees from <br />tri-mining projects and wind storms. In addition, used to cold cut (coulter) asphalt <br />patches. <br />Loader 3 <br />^ Is used for similaz street, storm water projects as loader 2. It is used with the <br />grapple bucket to pick up brush and trees from trimming projects and wind <br />storms. <br />