My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 01-16-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
01-16-1995
>
5.6. SR 01-16-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:07 AM
Creation date
9/17/2007 4:18:41 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Mr. Steve Ach <br />January 19, 1995 <br />Page Four <br /> <br />c. <br /> <br />STORM DRAINAGE <br /> <br />. <br /> <br />The storm drainage plan submitted by the Developer consists of a series of small <br />ponds spread throughout the proposed plat that are intended to restrict the runoff <br />from the site to its current rate. Runoff currently leaves the site through a 24-inch <br />diameter culvert under TH 10. The intent of the Drainage Plan is to continue to <br />utilize this existing culvert to its fullest extent. At this point in time, it is difficult <br />to give definitive comment on the Storm Drainage Plan because the City has just <br />authorized a Comprehensive Drainage Plan for the entire western area of the City. <br />We would indicate, however, we are somewhat negative on the layout of the ponds <br />in this development, since they overlap drainage and utility easements. In other <br />words, these easements in a storm situation would be flooded and virtually useless <br />for telephone, electric, or cable installations that are above ground. We would like <br />to reserve final comment on the Storm Drainage Plan and the layout of the ponds <br />until we have been able to complete our preliminary analysis of the overall western <br />area which should be accomplished prior to this plat being submitted to the City <br />Council. We would indicate, however, that the concept is reasonable and we do not <br />believe that the issue of final layout of the storm drainage system should be reason <br />to hold up the progress of this plat. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />~~ <br />;e~ J( '~ur~r, P .E. <br /> <br />TJM:tw <br /> <br />. <br /> <br />230n59-190S.jan <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.