My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 01-16-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
01-16-1995
>
5.6. SR 01-16-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:07 AM
Creation date
9/17/2007 4:18:41 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />l'o\sn TIM; ENIa~EEIlS <br /> <br />1326 Energy Pork Drive <br />51. Paul, MN 55108 <br />612-644-4389 <br />1-800-888- 2923 <br />Fox: 612-644-9446 <br /> <br />CIVil ENGINEERING <br />ENVIRONMENTAL <br />MUNICIPAL <br />.LANNING <br />SOLID WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORT AnON <br /> <br />ELECTRICAl/MECHANICAL <br />ENGINEERING: <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br /> <br />.INNEAPOllS <br /> <br />PRIOR lAKE <br /> <br />ST. PAUL <br />. i <br />W ASECA <br /> <br />January 19, 1995 <br />File: 230-259-11 <br /> <br /> <br />Mr. Steve Ach <br />City Planner <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: COUNTRY CROSSINGS BUSINESS CENTER PRELIMINARY PLAT <br />AND SHOPPING CENTER <br /> <br />Dear Mr. Ach: <br /> <br />As requested, we have reviewed the information submitted for the Country Crossings <br />Business Center preliminary plat and the shopping center proposed on Lot 1 Block 1. The <br />information we received relative to the plat consisted of a preliminary plat, Preliminary <br />Utility Plan, and Preliminary Grading Plan, all prepared by John Oliver and Associates, <br />and dated December 27, 1994. For the proposed shopping center, we received a <br />Preliminary Site and Utility Plan and Preliminary Grading Plan also prepared by John <br />Oliver and Associates, and dated December 27, 1994. In addition, we received a <br />Comprehensive Drainage Study for the area, again prepared by John Oliver and Associates, <br />dated December 23, 1994. Based on" our review of these documents, we would offer the <br />following comments: <br /> <br />A. <br /> <br />PRELIMINARY PLAT <br /> <br />The major issue concerning the preliminary plat is the alignment of Business Center <br />Drive and the right-of-way widths for the eastern portion of Business Center Drive <br />and the northern portion of Joplin Street. On the west end of Business Center <br />Drive, the right-of-way alignment intersects with the west plat boundary at a jog in <br />the MnDOT right-of-way. In other words, if the right-of-way were continued <br />westerly from the plat boundary, it would be partially within MnDOT right-of-way <br />because the right-of-way is wider west of this proposed plat. Therefore, we would <br />recommend that the alignment of Business Center Drive be brought slightly farther <br />to the south so that the north right-of-way line of Business Center Drive aligns with <br />the south right-of-way line of TH 10. <br /> <br />230/259-1905.jan <br />
The URL can be used to link to this page
Your browser does not support the video tag.