My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 01-16-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
01-16-1995
>
5.6. SR 01-16-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:07 AM
Creation date
9/17/2007 4:18:41 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to Planning Commission <br />January 24, 1995 <br /> <br />Page 4 <br /> <br /> <br />. <br /> <br />3. <br /> <br />Underground irrigation shall be provided throughout all <br />landscaped areas as set forth in the business park standards. <br /> <br />C. Pedestrian Circulation <br /> <br />1. It is recommended that a sidewalk connection be provided to <br />the interior parking area from the sidewalk along Joplin. This <br />will provide a convenient access for customers either biking or <br />walking from the residential area to the south to the <br />convenience center. <br /> <br />D. Refuse Collection <br /> <br />1. Each of the three trash enclosures proposed behind the <br />convenience center shall be screen with an enclosure <br />comprising of masonry materials that will complement those <br />included on the principal building. <br /> <br />2. Each of the enclosures shall be large enough to accommodate <br />the collection of recyclable materials. <br /> <br />~". <br />. <br /> <br />3. <br /> <br />The trash enclosure shall be incorporated into the landscape <br />plan to maximize the screening from Business Center Drive. <br /> <br />E. Buildine- Elevations <br /> <br />1. Additional information needs to be provided regarding the <br />specific materials planned to be used on the building. <br /> <br />F. Other Issues <br /> <br />1. Efforts should be made to buffer the appearance of any vent <br />pipes from the underground tanks. <br /> <br />2. Any grading within MnDOT right-of-way will require a permit. <br />This will need to be obtained prior to issuance of a building <br />permit. <br /> <br />G. Sirnae-e <br /> <br />1. A complete sign package will need to be submitted for review <br />and approval. <br /> <br />. <br /> <br />2. <br /> <br />Free-standing sign shall be a monument style and wall signs <br />consist of individual letters. <br /> <br />s:planning:pc:cu94-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.