My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 09-17-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
09/17/2007
>
5.4. SR 09-17-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:07 AM
Creation date
9/14/2007 9:10:21 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />REQUEST FOR ACTION <br /> <br />To <br />Ci Council <br />Agenda Section <br />Administration <br /> <br />Meeting Date <br />September 17, 2007 <br /> <br />Item Number <br />5.4. <br />Prepared by <br />Bill Maertz, Parks and Recreation <br />Director <br />Reviewed by <br />Lori ohnson, Ci Administrator <br />Reviewed by <br /> <br />Item Description <br />Library Porch Addition <br /> <br />Action Requested <br /> <br />Authorization to include screened porch as part of the Elk River Library Project <br /> <br />Background/Discussion <br />The original concept design for the Elk River Library included a screened porch with Adirondack chairs, <br />and a view of Lake Orono. It was cut out of the project as a cost saving measure. At the August 2007 <br />Library Board meeting, the board voted to recommend including the screened porch. The porch addition <br />would cost approximately $75,000. This price includes design and structural engineering fees. The term <br />screen porch is somewhat misleading as this space would be a high quality, architecturally designed <br />structure that would incorporate building materials similar to the new library. <br /> <br />Jennifer Anderson Tuttle, of KKE Architects, will attend the meeting to discuss the concept. <br /> <br />Financial Impact <br />Approximately $75,000. <br />The library project stated with a contingency of $125,000 which has not been spent. <br /> <br />Attachments <br /> <br />· Memo from Mick Stoffers, Branch Librarian <br /> <br />Action <br /> <br />Motion by _ <br /> <br />Second by _ <br /> <br />Vote <br /> <br />Follow Up <br /> <br />C: \Documents and Settings \jmiller \Local Settings \ Temporary Internet Files \ OLK3E\Porch Addition.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.