Laserfiche WebLink
<br /> i <br /> 2008 CAPITAL PUTLAY <br /> I <br /> Funding Source <br /> Requested General Other CapaoJ Outlay 2006 Uquor Gov't Bldg Department <br />Department Item Amount Fund Fund Reserve Designated FB Fund Fund Total <br />Information Tech Microsoft Licensing 30,000 30,000 <br /> HP Storage Area Network 15,000 15,000 <br /> Barracuda SpamNlrus Firewall Replacement 5,000 5.000 <br /> 50,000 50,000 <br />City HalUBuildlng Maintenance New vehicle with plow 32.000 32,000 <br /> Chiller 70,000 70,000 <br /> 2 water heaters 8,500 8.500 <br /> 110,500 110,500 <br />Finance Financial Software 70.000 70,000 . <br /> 70,000 70.000 <br />HR Time Tracking Software 20,000 20,000 <br /> 20,000 20,000 <br />Building <br /> Scanning Equipment 30,000 ' 30,000 <br /> 30,000 30.000 <br />Police 3-Mobile video cameras 19,000 ' 3,000 16,000 <br /> Squad Cars (3) 99,000 99,000 <br /> Upgrades to 800 MHZ radio 10,000 10,000 <br /> Mobile Squad computers (3) 18,000 18,000 <br /> Police software - LETG repayment 57.600 57,600 <br /> 2nd Floor for IT 6,000 i 6,000 <br /> CSO Vehicle 25,000 25.000 <br /> 234,600 234.600 <br />Equipment Services In floor hoist 30.000 30.000 <br /> Fleet Management Software 35,000 35.000 <br /> 65.000 65.000 <br />Emergency Mgmt Siren (Mississippi Rd and Rawlins St NW) 14.700 14,700 <br /> 14,700 14,700 <br />Streets Front End Loader (replaces 305) 175,000 175.000 <br /> Small Equipment 35,000 35,000 <br /> 1 Single Axle with Plow (replaces 223) 160,000 160,000 <br /> Floor in cold storage building 20,000 20,000 <br /> Roof repair - Street garage 10,000 10.000 <br /> 400,000 400.000 <br />Sr. Citizens Cooling system condenser 14,000i 14,000 <br /> Controls 12.000, 12.000 <br /> 26,000 26.000 <br />Park Maintenance <br /> 80 HP Tractor/Loader/Snow Blower 49,000' 49,000 <br /> 49,000 49,000 <br />Subtotal General Fund Departments 1,069,800i 380,300 125.000 424,000 140,500 1.069,800 <br />Pinewood Pond Liner 16,000' 16.000 <br /> 16,000 16,000 <br />Library Floor Scrubber 5,400, 5.400 <br /> 5,400 5,400 <br />Ice Arena Electric Resurfacer 100,000 100,000 <br /> Replace battery in Electric Resurfacer 9.5011 9,500 <br /> 109.500 109.500 <br />Wastewater <br /> New control panel - lift 15.000 15,000 <br /> new confined space entry tri-pod/lifeline 5,000 5,000 <br /> 20,000 20,000 <br />Total $1,220,700 $380.300 $41.400 $125,000 $424,000 $109,500 $140.500 $1.220,700 <br />. = $40,000 was designated a few years ago in the Capital OuUay Reserve fund in anticipation of financial system upgrade. <br /> <br />