My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 08-20-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
08/20/2007
>
6.4. SR 08-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:05 AM
Creation date
8/17/2007 1:49:14 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />, <br />site to convey material from the active face to the processing <br />equipment and to the operations area established at Tiller's existing <br />facility. <br /> <br />There will be no water supply well or buildings constructed in <br />association with this permit. <br /> <br />No explosives will be used at the site. <br /> <br />10.) Drainage, Erosion Control, Sedimentation, Dust, Access Control and <br />Security: <br /> <br />Surface water drainage will be directed to low areas on the adjacent <br />Tiller mining operation. Collected surface water infiltrates into the <br />underlying soils and/or evaporates. Surface water drainage will not be <br />directed off the Tiller site. Sedimentation may occur in the temporary <br />ponding areas. These ponds Gan be readily cleaned out by on-site <br />equipment. The site will operate under a Minnesota NPDES permit for <br />gravel mining facilities and a Storm water Pollution Prevention Plan will <br />be prepared for the site as required by the NPDES permit. <br /> <br />Erosion of finished slopes will be minimized by backfilling to a <br />minimum slope of 4: 1 and seeding and mulching in accordance with <br />the Reclamation Plan. <br /> <br />Dust control will consist of watering on-site gravel haul roads as <br />needed. Conveyors will be used within the site, minimizing truck <br />traffic on internal haul roads. Perimeter berms will also limit dust <br />movement from the site. <br /> <br />Access to the site will be controlled through Tiller's existing facility <br />which consists of a combination of locking gate, berms, signs and <br />fencing. Additional fencing will be installed along the south and east <br />sides of the proposed mining operation just outside of the mining <br />limits. <br /> <br />11 .) Restoration Plan <br /> <br />Because the site is relatively small, it will be mined in one phase and <br />restored in one phase. Reclamation activities at the site will consist of <br />backfilling, grading, and seeding. Final grades will range from 1 % to <br />25 %. Final restoration grades are shown on the Reclamation Plan, <br />Sheet C3. <br /> <br />Page 7 of 1 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.