My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 08-20-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
08/20/2007
>
6.4. SR 08-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:05 AM
Creation date
8/17/2007 1:49:14 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />9.) <br /> <br />. <br /> <br />- <br /> <br />I <br /> <br />leave the site at an eleviation ranging from 1050-1070 feet <br />above msl. The tops o~ the sides lopes along the eastern and <br />southern portions of the property will match the existing grade <br />at the perimeter of the mining limits which are at approximately <br />1 080-1 090 feet above msl. <br /> <br />Figure 3 is a U.S.G.S. Quad map excerpt that illustrates the site <br />setting. <br /> <br />c. Estimate of Quantity of Material to be Mined: <br /> <br />The estimated net quantity of material to be removed from the <br />property is between 300,000 and 400,000 cubic yards. This <br />does not include topsoil or overburden. <br /> <br />d. Depth of Water Table: <br /> <br />The depth of the water table was identified during the Elk River <br />Gravel Mining District EIS process. The water table ranges from <br />about 930 feet above msl in the northwest corner of the site to <br />about 925 feet above msl in the southeast corner of the site. <br />Groundwater flow direction is to the southeast. The elevation <br />of the water table corresponds to approximately 160 feet below <br />existing grades, 60 feet below excavation grades and 120 feet <br />below reclamation grades. <br /> <br />e. Average thickness of overburden <br /> <br />The average thickness of overburden is estimated to be 20 feet. <br /> <br />Plan of Operation: <br /> <br />The plan of operation is to strip the overburden, utilizing some of the <br />material to create a perimeter screening berm along the eastern portion <br />of the proposed mining area. After the overburden has been stripped, <br />material will be excavated starting from the floor of Tiller's existing <br />operation moving from the north to towards the south and lor from the <br />west to the east. This will keep all mining and processing equipment <br />recessed 70-100 feet below the surrounding grade. This will minimize <br />visibility as well as noise and dust emissions. <br /> <br />Crushing and screening will take place throughout the mining <br />operation. Processing equipment will generally move along with the <br />progression of the active face. Conveyors will be used throughout the <br /> <br />Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.