Laserfiche WebLink
<br />Case File: CU 07-21 <br />Page 2 <br /> <br />Attachments <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Holy Trinity Episcopal Church <br />Conditional Use Permit <br /> <br />Location Map <br />Applicant's Narrative <br />Site Plan dated August 14, 2007 <br />Architectural plans dated July 23, 2007 <br />Engineers Comment letter dated July 12, 2007 <br />Staff Comment letter dated July 16, 2007 <br />Historic Preservation comments dated Aukust 14,2007 <br />HPC Pictorial Representation <br />CUP Document <br /> <br />General Information <br /> <br />Applicant <br />60 Day Rule <br /> <br />John Weicht, on behalf of Holy Trinity Episcopal Church <br />The application has 1j>een deemed complete as of July 23, 2007. <br />The City must take action by September 23,2007 <br />Conditional Use Permit <br />1326 4th Street NW, approximately 1 acre <br /> <br />Requested Action <br />Location and Size <br /> <br />Location <br /> <br />Subject <br />Property <br /> <br />North <br /> <br />South <br /> <br />East <br />West <br /> <br />Overview <br /> <br />Existing Use <br /> <br />Land Use Plan Designation <br /> <br />Current Zoning <br /> <br />Church <br /> <br />Old Town <br /> <br />R-1c <br /> <br />SF Residential <br /> <br />, <br /> <br />R-1c <br /> <br />Old Town <br /> <br />Church <br /> <br />Old Town <br /> <br />R-1c <br /> <br />SF Residential <br />SF Residential <br /> <br />Old Town <br />Old Town <br /> <br />R-1c <br />R-1c <br /> <br />As noted above, the applicant proposes several actions"including a Conditional Use Permit to permit the <br />construction of a 2,120 square foot addition and the retp.odel of the existing 900 square foot annex on the <br />east side of the main church. <br /> <br />The church is also combining its parcel with the parcel currendy hosting a single family home to the <br />southwest, allowing for the construction of the parking lot. <br /> <br />Building addition - The addition will include a large open room, restrooms, and a kitchen. The <br />remodeled area will include three offices and a classroor' <br />I <br />The addition floor will be two feet above the existing annex floor. The roof of the addition will be <br />approximately 4 feet lower than the peak of the sanctuairy roof. The exterior of the addition is proposed <br /> <br />S:\PLANNING\Case Files\CUP\CU 07-21 Holy Trinity\CU 07-21 Holy Trinity Episcopal Church.doc <br />