Laserfiche WebLink
<br />Stree~ I <br />6) The new driveway on 4th Street and also the !relocated driveway on Rush Ave need to <br />be brought up to city standards (refer to City Engineers memo). <br /> <br />Architecture <br />7) More detail is needed for the elevation Plansl What are the materials and colors? <br /> <br />Miscellaneous <br />8) Compact parking is shown on the site plan, the city does not allow compact parking. <br />9) The lots should be combined, this process cain be done through Sherburne County. <br /> <br />It is helpful to generate a point by point response letter to these comments as part of your <br />next submittal. That way, focus can be directed to comments that werenot addressed and <br />to those that required additional discussion, reducing time necessary for staff review. <br /> <br />The point by point letter and revised drawings should be provided by July 23. The <br />revised submittal should include five full size sets as well as four llx17 reduced sets for <br />the Planning Commission review. A .pdf copy of all revised graphics are required to <br />be submitted. <br /> <br />Please do not hesitate to contact me should you have any questions, I can be reached at <br />(763) 635-1035. <br /> <br />Sincerely, <br /> <br />g~0e~ ()~ <br /> <br />Sheila Cartney <br />Senior Planner <br />