My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 08-13-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
08/13/2007
>
5.2. SR 08-13-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:05 AM
Creation date
8/10/2007 12:09:59 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Associates to review the tax impact of street rehabilitation projects so the projects could be <br />timed and sized to keep the tax rate constant. When that Financial Management Plan was <br />presented to the Council, it included a recommendation that the city maintain a $1,000,000 <br />street improvement reserve. The reserve is necessary to fund emergency street projects, <br />offer a cushion for the tax levy for street rehabilitation projects, and maintain adequate cash <br />flow until MSA or bond funds are received. Weare carrying this recommendation through <br />in the proposed CIP. <br /> <br />As I said earlier, the 2007 street rehabilitation and 193rd projects have utilized most of the <br />available street funds for the next several years. There is money available on an on-going <br />basis each year for some projects depending upon the Council's priorities. For example, the <br />proposed CIP includes funds for improvements to railroad crossings to decrease the whisde <br />noise. If the Council decides not to do those improvements, more funds are available for <br />other projects. The proposal also includes funding the Highway 10 geometric study in 2007 <br />and purchasing rights-of-way for Highway 169 and County Road 33. The Council will need <br />to decide how to proceed with acquiring the rights of way that will be needed for both of <br />these projects. <br /> <br />Along with discussing the 2008 - 2012 CIP, there is one 2007 project that staff wants to <br />discuss, Main Street and Jackson Avenue. With construction nearing completing on the four <br />projects in that area, consideration of a project to improve the streets should take place. The <br />developers were required to restore the street; however, there are other improvements that <br />could be made to improve pedestrian movement and improve the appearance of the streets. <br />A memo on this project from Public Works Director Terry Maurer is attached. <br /> <br />Next, we will go into discussion about the projects that are programmed from 2008 through <br />2012, focusing mainly on 2008. Priorities may change and projects may come to the surface <br />that we cannot anticipate now so those will be adjusted each year as we annually approve the <br />CIP. The attached summary sheet tided Project & Funding Sources by Department <br />provides a listing of all the projects for the next five years, the funding source, and the <br />estimated project cost. A description of each project is also attached. Terry Maurer will be <br />present to discuss the projects in more detail at the meeting. <br /> <br />In conclusion, Council approval is not expected at the worksession; this is a time for <br />discussion and input from the Council so that we can prepare a final CIP. However, staff <br />would like direction on the Main Street and J ackson Avenue project so that can proceed this <br />fall. <br /> <br />S: \Council\Lori\2007\CIP Streets 08 13 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.