My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.5. SR 08-13-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
08/13/2007
>
3.5. SR 08-13-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:05 AM
Creation date
8/10/2007 12:06:21 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Aug 02 07 10:36a <br /> <br />robert crooks NORTH STAR <br /> <br />952 469 5246 <br /> <br />p.1 <br /> <br />" <br /> <br />North Star Pump <br />Bob Crooks <br />24645 Iceland Path <br />Lakev~le. MN 55044 <br />phone 612-597-7373 <br />Fax: 952-469-5246 <br /> <br /> <br />City of Elk River <br />248 Railroad Drive <br />Elk River, MN 55330 <br /> <br />Att: Gary Leirmoe <br /> <br />Fax: 763-635-1177 <br /> <br />From: Mike Riippa <br /> <br />Cell: 612-597-2284 <br /> <br />Re: Sanitary Lift Station Hatch Opening Safety Grating <br /> <br />Gary, <br /> <br />We are pleased to offer you our quotation for safety hatches for <br />your sanitary lift stations to be installed below existing aluminum hatch <br />covers to protect the safety of your operators. The following is a description <br />of the scope of materials and labor provided on this project. <br /> <br />Scope of Materials <br /> <br />(23) Special safety grates consisting of dual hinged aluminum grate designed <br />for a 300'PSF loading and will be furnished with 316 stainless steel hold <br />open rods, hinges and hardware, aluminum pull-open arms, a staple for a <br />padlock, stainless steel anchoring hardware, hatch angle supports, and a <br />safety orange finish. Grates do vary in dimensions for site to site and have <br />been measured accordingly. <br /> <br />(1) Lot of labor for installation of all hatches provided. and necessary relocating <br />of pump guide systems upper brackets and cable racks in order to complete <br />safe and functional grating at all specified lift stations. <br /> <br />(1) Lot of travel and mileage to and fromjobsites in order to complete project, along <br />with removal of all job related debris. <br /> <br />Total Price: $23.336.00 Dlus tax <br /> <br />Please let us know if there is any questions or comments, thanks again <br />for the opportunity to quote your project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.