My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.7. SR 08-06-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
08/06/2007
>
3.7. SR 08-06-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:04 AM
Creation date
8/3/2007 9:38:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/6/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Item #3.7. <br /> <br /> <br />MEMORANDUM <br /> <br />TO: Mayor and City Council <br />Terry Maurer, City Engineer ,....~ <br /> <br />FROM: <br /> <br />DATE: August 6, 2007 <br /> <br />SUBJECT: TH 169 Resolution Indicating Chosen Alternatives <br /> <br />I have been contacted by Craig Robinson, MnDOT's Project Manager for the 1H 169 <br />Corridor. He has asked that the resolution the City Council has been considering regarding <br />the chosen alternatives for the various interchanges along 1H 169 be held until late <br />September or early October. The reason for Craig's request is he is having their consultant, <br />the SRF Group, perform additional analysis on the Main Street/School Street options. <br />These further analyses are due to the questions and issues that were raised as the folded <br />diamond and center point interchange options at Main Street were discussed relative to <br />access to adjacent properties. Mr. Robinson felt it was important to do the more detailed <br />analysis to provide answers to the various questions that were raised regarding access and the <br />operation of the two different interchanges. Mr. Robinson indicated that this delay in <br />presenting the resolution to the Council will not hold up the overall study, as the consultant <br />will be able to begin environmental studies and geometric layouts for the northern <br />interchanges within Elk River. <br /> <br />When Mr. Robinson indicates that their analysis is complete, we will schedule this item for a <br />future city Council meeting. <br /> <br />S:\EngineerImprovProj\2007 Improvement Projects\ TH 169 Study\07 06 07 CC memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.