My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 11-21-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
11/21/1994
>
5.3. SR 11-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:02 AM
Creation date
7/5/2007 12:48:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOU-1B-1994 12:39 FROM EOS ARCHITECTURE-INC <br /> <br />TO <br /> <br />4417425 P.02 <br /> <br />. .EOS <br /> <br />Arcllitects and Engineers <br /> <br />OffIces i.1) .Rochc~lcr <br />..",,1 M.ill"""I'"I;", MS <br /> <br />TSPIEoS <br /> <br />ZI Wal"'l 3lW,",l <br />Rxcclsil1T. MN :i53~1 <br />FAX (612) 474-3928 <br />TEl. (612) 474-:1291 <br /> <br />Member Q{TSP Group: <br />Ru.;lw:;L;:r, MN <br />MinncHpoli.~. MN <br />Dent'cr, (:0 <br />GUlette, Vi)' <br />Rapid City. SD <br />Sh\\ridall. wy <br />.5J.OU:r.: Fa.lIs. SI) <br />Mll.r.<halltnwn.IA <br /> <br />e <br /> <br />e <br /> <br />An ~quaJ ()ppormnlry, <br />AftirmarNe Action <br /> <br />Employer <br /> <br />ITEM 5.3. <br /> <br />MEMORANDUM <br /> <br />TO: Patrick Klaers - City .f\dminilltrator City of Elk River <br />FROM; Rick G. Wessling- TSP I Eoe ArcbiteoWre <br />DATE: 11-17-94 <br /> <br />Be: Elk River Library Expansion <br /> <br />On November the 1st. TSP I Eos Architecture reviewed the CODStn1cticm <br />at tho libmry aDd gCDoru.tod a "pUDch list" CUWD.OJUting the <br />miscellaneous items which need to be colTeCted. We found the project to <br />be substantially complete and the board has CODcUlT8d with our <br />dctcnDmaticm, therefore we will prooocd to issue the certificate of <br />SlIbstantial completion dated November the 1st. This corresponds with <br />the contractom required date of substantial oompletion of October the <br />31st. This is the date which establishes the beginning ofwornmty <br />periods for equipment. <br /> <br />The library is rurmiD&' under its new arrangement with. only minor items <br />to be COlTeCted. The contractor has indicated his intent to have all the <br />-punch list" items completed by the end of the month. The only itBm <br />which will need to be completed in the spring is the complete charging of <br />the air conditioning compressor. This is aD acceptable schedule to us. <br /> <br />In regard. to the funding VB. actual conatl"uction costs the attached <br />summary indicates the estimated amounts by line item VI. the actual <br />cost. At the bottom is the amount of funds remaining ($32,095.00) These <br />moines could be used to fund t\uuishingB au.d equipment needed in the <br />new larger facility. <br /> <br />PleaBe do not hesitate to call if you have any questioDs. <br /> <br />End of Memo <br /> <br />94103\D0C\C0UNCIE-DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.