Laserfiche WebLink
<br />. <br /> <br />C. <br /> <br />BUSINESS HOURS BE LIMITED TO 7 AM TO 10 PM, MONDAY <br />THROUGH SUNDAY AND BE SUBJECT TO REVISIONS AT <br />THE TIME OF SITE PLAN APPROVAL. <br />ALL OTHER ELEMENTS SHOWN ON THE PROPOSED SITE <br />PLAN BE INCLUDED AND MADE PART OF FUTURE <br />APPROVALS. <br />TERMS AND CONDITIONS FOR ADMINISTERING <br />DEVELOPMENT OF THE PUD . <br /> <br />D. <br /> <br />E. <br /> <br />2. ALL FUTURE SITE PLAN PROPOSALS BE REVIEWED THROUGH <br />THE CONDITIONAL USE PERMIT PROCESS. <br /> <br />3. ALL COMMENTS WITHIN THE PLANNING COMMISSION REPORT <br />DATED AUGUST 23, 1994, AND TERRY MAURER'S MEMO DATED <br />AUGUST 18, 1994, BE INCORPORATED INTO THE DEVELOPMENT <br />PLAN AND APPROVAL OF THIS CONDITIONAL USE PERMIT. <br /> <br />4. GUIDELINES FOR SIGNAGE FOR THE PLANNED UNIT <br />DEVELOPMENT CONSIST OF: <br /> <br />ONE MONUMENT STYLE SIGN IDENTIFYING THE <br />DEVELOPMENT WITH A MAXIMUM HEIGHT OF TWENTY <br />(20) FEET AND A WIDTH OF FIFTEEN (15) FEET. <br />ONE MONUMENT STYLE SIGN IDENTIFYING THE <br />RESTAURANT WITH A MAXIMUM HEIGHT OF TEN (10) <br />FEET AND AREA OF ONE HUNDRED (100) SQUARE FEET. <br />WALL SIGNAGE CONSISTING OF INDIVIDUAL LETTERS <br />WITH A MAXIMUM LETTER HEIGHT OF THREE (3) FEET. <br /> <br />5. ACCESS POINTS OF THE DEVELOPMENT INCLUDE ONE AT 189TH <br />AVENUE AND ONE AS FAR SOUTH AS POSSIBLE BASED ON FINAL <br />IMPROVEMENT PLANS FOR DODGE AVENUE AND HIGHWAY 169 <br />INTERSECTION. <br /> <br />. <br /> <br />A. <br /> <br />B. <br /> <br />C. <br /> <br />6. ALL PARKING AREAS BE BOUNDED BY B612 CONCRETE CURB <br />AND GUTTER. <br /> <br />7. EARTH BERMING BE MAXIMIZED ALONG THE EAST PORTION OF <br />THE SITE TO BUFFER THE COMMERCIAL FROM THE <br />RESIDENTIAL AREA. <br /> <br />8. THE LANDSCAPING PLAN INCLUDE A VARIETY OF LANDSCAPE <br />MATERIAL WITH AN EMPHASIS OF CONIFERS ALONG THE EAST <br />PORTION OF THE PROPERTY WITH A VARYING SIZE OF SIX TO <br />EIGHT (6-8) FEET. ALSO, ADDITIONAL LANDSCAPING BE <br />INCLUDED WITHIN THE LANDSCAPED AREA ALONG HIGHWAY <br />169. <br /> <br />9. A LANDSCAPING THEME BE ESTABLISHED AND INCORPORATED <br />INTO THE DEVELOPMENT. <br /> <br />. <br /> <br />10. <br /> <br />THE EXISTING TREE AT THE SOUTH END OF THE SITE BE SAVED <br />AND INCORPORATED INTO THE DEVELOPMENT. <br />