My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORD 07-005
ElkRiver
>
City Government
>
City Council
>
Council Ordinances
>
2000 - 2009
>
2007
>
ORD 07-005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2013 9:39:48 AM
Creation date
6/28/2007 2:04:36 PM
Metadata
Fields
Template:
City Government
type
ORD
date
6/18/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />1. The owner or operator of a commercial or industrial establishment shall provide, at <br />their own expense, reasonable protection from accidental discharge of prohibited <br />materials or other wastes into the storm sewer system or watercourses through the <br />use of structural and non-structural BMPs. <br /> <br />2. Any person responsible for a property or premise, which is, the source of an illicit <br />discharge, shall be required to implement, at said person's expense, additional <br />structural and non-structural BMPs to prevent the further discharge of pollutants to <br />the storm sewer system. These BMPs shall be part of a storm water pollution <br />prevention plan (SWPPP) as necessary for compliance with requirements of the <br />NPDES permit. <br /> <br />(e) Construction and building site activity. <br /> <br />Construction sites and landscaping projects are especially susceptible to erosion and <br />pollution. For this reason, construction site operators must control waste such as discarded <br />building materials, concrete truck washout, chemicals, petroleum products, litter, and <br />sanitary waste at the construction site that may cause adverse impacts to water quality. The <br />developer shall be held responsible for adherence to these required prevention and control <br />measures: <br /> <br />1. A designated area shall be provided on site for concrete truck washout. The area <br />shall be constructed so as to contain washout material and be located at least fifty <br />(50) feet away from any storm drain inlet or receiving water during construction. <br />Upon completion of construction activities the concrete washout material will be <br />removed and properly disposed of prior to the area being restored. <br /> <br />2. The guidelines below should be followed concerning debris storage and disposal: <br /> <br />a. Daily cleanup of construction site shall be performed to ensure that all litter <br />is contained in an appropriate enclosure or container so as not to accumulate <br />on the ground. <br /> <br />b. Operators must keep solid waste materials in either a container or an <br />enclosed waste collection area. <br /> <br />c. Empty / unused chemical containers must be disposed of in accordance with <br />label instructions. <br /> <br />d. Potentially hazardous waste must be separated from non-hazardous waste. <br /> <br />e. Recycling of waste materials is encouraged when possible. <br /> <br />f. All construction site wastes must be disposed of at authorized disposal <br />facilities. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.