Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />investigation report. The soil engineer shall render a fInding as to the <br />adequacy of the site for the intended use. <br /> <br />c. A geologic grading report prepared by the engineering geologist, including a <br />fInal description of the geology of the site and any new information disclosed <br />during the grading and the effect of same on recommendations incorporated <br />in the approved grading plan. The geologic engineer shall render a fInding as <br />to the adequacy of the site for the intended use as affected by geologic <br />factors. <br /> <br />(2) Notijication of completion. The permittee or his agent shall notify the city when the <br />grading operation is ready for fInal inspection. Final approval shall not be given <br />until all work, including installation of all drainage facilities and their protective <br />devices, and all erosion-control measures, has been completed and turf has been <br />established in accordance with the fInal reviewed grading plan and the required <br />reports have been submitted. <br /> <br />Reference nuisance language. <br /> <br />R. Penalty. <br />Any person convicted of violating this chapter shall be guilty of a misdemeanor and <br />shall be subject to a fIne or imprisonment in the county jail, or both, as specifIed by <br />state statute. Such penalty may be imposed in addition to suspension or revocation <br />of the grading permit. <br /> <br />Section 3. This ordinance shall take effect upon adoption as provided by law. <br /> <br />Passed and adopted this 18th day of June 2007 by the City Council of the City of Elk River. <br /> <br /> <br />W-'a~ <br /> <br />ArrEST: <br /> <br />i <br /> <br />32 <br />/ /// <br />U<>/__ <br /> <br />,--"" <br /> <br />Tina Allard, City Clerk <br /> <br />14 <br />