Laserfiche WebLink
<br />rll -\j <br />( )j <br />~l}{ <br /> <br />ITEM 5.7. <br /> <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Mayor & City Council <br /> <br />DATE: <br /> <br />December 19, 1994 <br /> <br /> <br />FROM: <br /> <br />SUBJECT: Elk Hills Drive Improvement Project <br />Feasibility Study <br /> <br />A development project in the northeast corner of Elk Hills Drive and <br />Highway 169 received preliminary plat approval and conditional use permit <br />approval from the City Council on November 21, 1994. Associated with this <br />development project are some desired improvements at the Elk Hills <br />Drive/Highway 169 intersection, and, associated with this intersection <br />improvement project, are additional street improvements on Dodge Avenue <br />and 5th Street. <br /> <br />. <br /> <br />No one has been completely satisfied with the options for redesigning Elk <br />Hills Drive at Highway 169. Currently, the City Engineer is working with <br />MnDOT Officials to further explore design options for this intersection. <br />Please see the attached 12/9/94 City Engineer letter on this topic. <br /> <br />A representative for some of the busineses along Dodge Avenue has stated <br />his desire to have this Elk Hills Drive intersection improved and upgraded <br />before Memorial Day, 1995. A time line was put together that could <br />accomplish this goal, and this time line was outlined in a 11/9/94 letter from <br />the City Engineer (see attachment). <br /> <br />At this time, everyone should understand that this project cannot be <br />completed before Memorial Day, 1995. This is especially true when you take <br />into consideration the preparation of the intersection that would need to take <br />place before mid-April. Additionally, the City still needs to put together its <br />financing package for this project, hold public meetings on the design options <br />for the intersection, and go through the assessment process. This project can <br />be completed in 1995, but I do not believe that it is realistic to think that it <br />will be completed before Memorial Day. <br /> <br />. <br /> <br />council:ehdfeas <br /> <br />13065 Orono Parkway. P.O. Box 490. Elk River, MN 55330. (612) 441-7420. Fax: (612) 441-7425 <br />