Laserfiche WebLink
<br /> <br />I <br /> <br />Ie <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />~ <br /> <br />I <br /> <br />J <br /> <br />1 <br /> <br />J <br /> <br />, <br /> <br />e <br /> <br />PROJECT APPROACH <br /> <br />Opening Statement <br /> <br />RFP Project Outline <br /> <br />Project Lead Professional <br /> <br />Interview <br /> <br />/\ <br />Selection /) <br /> <br />Presentation of QualificationslProposalto the City of Elk River <br /> <br />RSP Architects, Ltd. and its consulting team members have reviewed the <br />City of Elk River's Request for Proposal For Design Services. We will <br />identify and define each element and the professional service provided to <br />meet the demands of each item. <br /> <br />Per addendum No. I information, the project will consist primarily of a <br />new refrigerated olympic sized ice rink adjacent to the existing indoor ice <br />arena. The new ice sheet will be enclosed in a structure that will <br />compliment the existing building and be of size to house 2,500 seats, four <br />team rooms, public toilets, lobby, ice refrigeration room and equipment. <br />The new ice sheet will be connected to the existing facility. The design <br />should allow that one ice resurfacer can service both sheets. <br /> <br />As previously indicated, the lead for your project will be L. Charles <br />Freiberg, Project Manager. Chuck Freiberg will coordinate the <br />consultants services, assist in the architectural design of the facility and <br />be the day-to-day contact for the City of Elk River concerning the <br />project. <br /> <br />If we are selected for the interview, Michael Plautz and Chuck Freiberg <br />will represent RSP and will be accompanied by Mark Holden of Holden <br />& Associates Consulting, representing the mechanical/electrical engineers <br />on the team. <br /> <br />Upon selection as your design team RSP and our team of consultants, in <br />acknowledgement of your schedule, will arrange a meeting on site to <br />gather actual field information and discuss possible design solutions. <br />During this time we would expect to receive any existing drawings and <br />information on the existing equipment and facilities that the City of Elk <br />River has to expedite the design process. Our design team and the task <br />force will meet and exchange information, clarify the scope of work and <br />set a trail to move forward. <br /> <br />RSP Architects. Ltd. <br /> <br />21 <br />