My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. SR 11-14-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
11/14/1994
>
5. SR 11-14-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:00 AM
Creation date
6/26/2007 12:45:19 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/14/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />M~ <br /> <br />I:ONSHTING ENGINEERS <br /> <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612-644-4389 <br />1-800-888- 2923 <br />Fax: 612-644-9446 <br /> <br />CIVIL ENGINEERING <br />ENVIRONMENTAL <br />MUNICIPAL <br />_ PLANNING <br />SOLID WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORTATION <br /> <br />ELECTRICAL! MECHANICAL <br />ENGINEERING <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br />_MINNEAPOLIS <br />PRIOR LAKE <br />ST. PAUL <br />W ASECA <br /> <br />November 9, 1994 <br />File: 230-246-80 <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: ELK HILLS DRIVE / DODGE AVENUE / 5TH STREET <br />POTENTIAL CONSTRUCTION SCHEDULE <br /> <br />Dear Mr. Klaers: <br /> <br />As requested by the City Council at their last meeting, I have prepared the following <br />proposed schedule for the improvement of 5th Street, Dodge Avenue, and the intersection <br />of Elk Hills Drive and TH 169. Based on discussion at the City Council meeting, the <br />schedule shows initiating a project at the November 14th City Council meeting and starting <br />construction early in the spring of 1995, with the project being completed at least through <br />the first lift of bituminous surfacing by Memorial Day 1995, in an effort to minimize <br />disruption to traffic along this commercial area. The schedule I would propose is as <br />follows: <br /> <br />November 14, 1994 <br /> <br />- Order feasibility study. <br />- Initiate plans and specifications. <br /> <br />November 28, 1994 <br /> <br />City Council accepts feasibility study and orders <br />public hearing. <br /> <br />December 1994 <br /> <br />- Staff holds informational hearing with affected <br />property owners. <br />- City Engineer works with committee of business/ <br />property owners on the design of the project. <br /> <br />January 23, 1995 <br /> <br />- Hold public hearing. <br />- Approve plans and specifications and authorize <br />advertisement for bids. <br /> <br />February 16, 1995 <br /> <br />Open bids. <br /> <br />230/246-0902.nov <br />
The URL can be used to link to this page
Your browser does not support the video tag.