My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.9. SR 06-18-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
06/18/2007
>
6.9. SR 06-18-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:59 AM
Creation date
6/15/2007 10:59:11 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/18/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Summary of Focus Group Meeting - 2 - May 17,2007 <br />Elk River Highway 169 Preliminary Design and Environmental Documentation <br /> <br />GREAT RIVER ENERGY <br /> <br />Representatives from Great River Energy (GRE) met with Craig Robinson (Mn/DOT), Terry <br />Maurer (City of Elk River), Dave Montebello (SRF Consulting Group), and Brett Danner (SRF <br />Consulting Group) at Elk River City Hall from 10:00 to 11 :30 a.m. The purpose of this meeting <br />was to involve a key stakeholder group from the Elk River community, and to discuss the <br />Highway 10/101/169 interchange and access changes to the GRE site. Focus group discussion is <br />summarized below. <br /> <br />. Plans for the Great River Energy (GRE) site were distributed. GRE plans to expand the <br />site as an energy park. Construction on a new peaking plant is anticipated to begin in <br />2008. Permits are pending on this expansion. A substation on the site will also be <br />expanded. <br /> <br />. GRE feels that right-of-way impacts from a new regional interchange (TH 10/101/169) or <br />from conversion ofTH 169 to a freeway will not be a significant issue. GRE has an <br />agreement through 2011 to use a portion of Mn/DOT right-of-way for geothermal heating <br />(underground pipes). This supplies most the heating and cooling to their facilities. The <br />critical issue for GRE will be access to their site. <br /> <br />. The BNSF Railway line passes through the GRE site. GRE uses a rail spur to receive <br />heavy equipment. A private rail signal with gate arms is located at the rail crossing <br />between the northern and southern portions of the site. GRE has not experienced any <br />safety problems at their at-grade railroad crossing. <br /> <br />. Heavy trucks access the site 24 hours a day. <br /> <br />. Employees access the site from all directions (TH 169, TH 10, Main Street). <br />Approximately 60 percent of employees access the site from the north, and 40 percent <br />access the site from the south. <br /> <br />. Deliveries typically come from the south and access the site from TH 10. <br /> <br />. GRE has experienced cut-through traffic on their site. Motorists are using the GRE site <br />to cut-through from TH 10 to TH 169. GRE is considering gating off their site to prohibit <br />such movements. <br /> <br />. ACTION ITEM: GRE will provide an estimate of traffic volumes to/from their site <br />to Terry Maurer. Terry will distribute this information to the project team. <br />Information to be provided includes: <br /> <br />RDF (refuse derived fuel) truck count (trucks that transport mixed <br />municipal waste to the site for electricity generation) <br />Delivery truck estimate <br />Trip estimate based on the number of employees planned at the site <br /> <br />· Access to the GRE site could be provided from the north at Main Street. A wider <br />roadway section on Main Street is recommended. <br /> <br />. Contact Michele Lommel at GRE to obtain plan and profile sheets of transmission <br />structures within the project area. <br /> <br />. Support for Alternative A3 and Alternative BC2 as preferred alternatives - provides <br />better access to their site and surrounding properties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.