Laserfiche WebLink
<br />SUMMARY OF PRELIMINARY EVALUATION <br />ELK RIVER HIGHWAY 169 <br />PRELIMINARY DESIGN AND ENVIRONMENTAL DOCUMENTATION <br /> <br />June 4, 2007 <br /> <br />SOUTH OF COUNTY HIGHWAY 33 SUB-AREA <br /> <br />A. Improvements Grouped into Sub-Area <br /> <br />. <br /> <br />Jackson / I 93rd / 197th Avenue Area <br />Main / School Street Area <br />Highway 10 / 10 I / 169 Interchange <br /> <br />. <br /> <br />. <br /> <br />B. Build Alternatives Considered <br /> <br />Jackson / 193rd / 197th Avenue <br />The design team considered two main build alternatives for the Jackson / 193rd / 197th Avenue area. These <br />main build alternatives are: <br /> <br />. Alternative DI (1)_ Split Diamond Interchange with Partial Access at 193rd Avenue: this interchange <br />alternative provides a bridge over Highway 169 at I 97th A venue along with access to and from <br />Highway 169 to and from the north, and a southbound slip ramp from 197th Avenue to Holt Street. <br />Alternative DI also provides a bridge over Highway 169 at Jackson / 193rd Avenue along with access <br />to and from Highway 169, but does not accommodate southbound exits from Highway 169 to Jackson <br />/ 193rd Avenue. <br /> <br />. Alternative D2 - Split Diamond Interchange with Full Access at 193rd Avenue: this interchange <br />alternative also provides a bridge over Highway 169 at I 97th A venue along with access to and from <br />Highway 169 to and from the north. This alternative also provides a bridge over Highway 169 at <br />Jackson /193rd Avenue along with access to and from Highway 169 in all directions. <br /> <br />Both alternatives require land from parcels along the proposed 197th A venue interchange ramps, relocation of <br />buildings and businesses in the southeast quadrant of the Jackson / 193rd Avenue interchange, and provide no <br />driveway access to 193rd Avenue between Evans Street and Dodge Avenue. However, full access at 193rd <br />will lessen the traffic related impacts at the 193rd/Jackson Avenue intersection, west of Highway 169, near <br />the cemetery. Therefore, since the impacts of the two alternatives are similar, but Alternative D2 provides <br />full access to Highway 169 at Jackson / 193rd A venue, the design team and the Local Advisory Committee <br />selected Alternative D2 as the Preferred Alternative. <br /> <br />Main / School Street Area <br />The design team considered three main build alternatives for the Main / School Avenue area. These main <br />build alternatives are: <br /> <br />. Alternative BC 1 - Main Street Interchange with School Street Overoass: this alternative provides a <br />full access interchange a Main Street and a bridge over Highway 169 at School Street, but no access <br />to or from Highway 169. Other key characteristics of this alternative include: <br /> <br />o No Highway 169 access at School Street forces all traffic wanting to access Highway 169 at <br />School Street to the Main Street or the Jackson / 193rd Avenue interchange. <br /> <br />o Excessive traffic on the frontagelbackage roads. <br /> <br />o Excessive traffic exiting at Main Street. <br /> <br />o High potential for overload ofthe Main Street interchange. <br /> <br />II) Electronic, color copies of the layouts are available on the project website's "Maps" page: <br />http://projects.dot.state. mn. us/srf/ 16gelkriverlmaps. html <br />