Laserfiche WebLink
<br />Ca~e File: P 07-05 <br />Page 4 <br /> <br />Analysis <br />The purpose of the PUD district is to provide opportunities for creative development and design <br />flexibility by allowing modification of lot and building area, width, setback and other dimensional <br />requirements. A PUD shall be consistent with the intent and purpose of the city Comprehensive Plan. <br />This property is currently zoned 1-1, Light Industrial and has a land use designation of Light Industrial; <br />the proposed uses are those that are permitted in the 1-1 district. Three buildings are not permitted on <br />one lot in the Industrial zoning district. <br /> <br />This request is unique in the fact that three buildings already exist on the property; typically PUDs are <br />formed for undeveloped land. The concept for this PUD is to have a campus type environment for <br />Sportech; shared access, parking, signage, storm drainage, Lots 3 and 4 will share a well and all lots will <br />have their own septic system. <br /> <br />Along with the PUD application, a subdivision is requested turning one lot into four lots. The applicant <br />proposes four lots to make the property more marketable to small businesses should Sportech outgrow <br />this location. Proposed Lots 2 and 4 will not have street frontage which is required for all lots, the <br />issuance of the PUD zoning would allow these lots without direct frontage. <br /> <br />Comprehensive Plan <br />According to the Comprehensive Plan "industrial uses are lower in intensity of activity. These uses limit <br />the potential for adverse impacts on adjacent land uses due to factors such as noise and odor." The <br />proposed subdivision and zoning change are consistent with the Comprehensive Plan. <br /> <br />Lots - As proposed the lot size break down is as follows: lot 1, 2.12 acres, Lot 2, 1.90 acres, Lot 3, 1.89 <br />acres and Lot 4, 2.65 acres all meeting the minimum lot size of 1 acre for the 1-1 district. <br /> <br />Parks <br />Park Plan - The Comprehensive Park Plan does indicate a trail corridor in this area. A 10-foot trail <br />easement along Jarvis should be provided. Park dedication is satisfied for this development. <br /> <br />Transportation <br />Streets - There are two access points along Jarvis Street, no additional access will be granted, the plat <br />should show restricted access along Jarvis Street with the exception of the existing driveways. Cross <br />access agreements for all four lots are necessary. <br /> <br />Utilities <br />Water/sanitation The subject lot is not within the urban service area; therefore, each of these buildings <br />would need an on-site sewer system and private well. Currently, Lots 1 and 2 will have their own well <br />and Lots 3 and 4 will share a well. Each lot will have their own septic systems. Cross access agreements <br />are necessary for the shared systems. <br /> <br />Storm sewer/water - There are two drainage ponds constructed for the four lots. It may be necessary to <br />expand the ponding if Lot 2 is developed. Drainage and utility easements should be placed on the ponds. <br /> <br />C:\Docurnents and Scttings\jmi1lcr\Local Settings\Temporary Internet Files\OLK3E\CC 06 18 07.doc <br />