Laserfiche WebLink
<br />"Garbage" means animal and vegetable waste resulting from the handling, preparation, cooking, <br />service, and consumption of food. <br /> <br />"Recyclables" are reusable or reprocessable materials approved and agreed to by the parties <br />hereto. Recyclables include such items as newsprint, corrugated and ledger paper, glass, plastics, <br />tin cans, aluminum, used motor oil, batteries, tires, and other metal goods. Recyclables <br />specifically exclude Refuse and compost. <br /> <br />"Refuse" is putrescible and nonputrescible solid waste from residences including Garbage and <br />Rubbish, and specifically excluding yard waste, recyclables, and toxic and hazardous wastes. <br />Refuse further excludes industrial, commercial, agricultural, and construction Garbage or Rubbish <br />and wastes. <br /> <br />"Rubbish" is inorganic solid waste, including ashes, consisting of both combustible and <br />noncombustible wastes, such as wood, bedding, crockery, and other nonreusable waste. Rubbish <br />also includes nonrecyclable types of glass, paper, cardboard, and metal cans. <br /> <br />N. SCOPE OF AGREEMENT <br /> <br />A. Collection Service <br /> <br />1. Garbage and Refuse Collection <br /> <br />a. Cart containers are to be furnished and maintained in good condition by the <br />Contractor. <br /> <br />b. Garbage and Refuse collection shall not include toxic and hazardous waste. <br /> <br />c. The Contractor shall deliver to and dispose of all such Refuse and Garbage <br />at the Elk River RDF Plant owned and operated by RRT, LLC. <br /> <br />d. The Contractor shall maintain receipts verifying amounts delivered to and <br />disposed at the Elk River RDF Plant. Such receipts shall be made available <br />for inspection by the City Administrator or an unauthorized representative. <br /> <br />2. Recycling Collection <br /> <br />a. The Contractor shall not mix other types of Refuse or inorganic materials <br />with the recyclables or take any action so as to make the recyclable material <br />unacceptable to the operators ofthe recycling center. <br /> <br />b. The Contractor must provide monthly tonnage reports for all materials <br />collected. The required information includes the market, the receipts, and <br />the net weight and type of material. <br /> <br />2 <br />