Laserfiche WebLink
<br />option would be to have the associations repair the streets as directed by the city engineer so they are in <br />good condition before they are conveyed to the City, transfer the balance of association fees collected for <br />road costs to the City, complete, at the associations' cost, all of the necessary surveying and legal <br />documents to convey the street property including rights-of-way, and fund the specialized equipment <br />needed for snow plowing. <br /> <br />Financial Impact <br /> <br />. A minimum up front cost of approximately $175,000 to purchase a special piece of equipment <br />for snow plowing <br /> <br />. Cost to hire an additional maintenance two operator for the additional snow plow route <br />(approximately $60,000 per year including benefits) <br /> <br />. Seal coat, crack filling, striping, pot hole repair, and overlay costs as identified in the attached <br />memo <br /> <br />. Normal on-going street maintenance costs for sweeping, signage, and etc. <br /> <br />Attachments <br />. Memo from Street Superintendent, Phil Hals <br /> <br />Action <br /> <br />Motion by _ <br /> <br />Second by _ <br /> <br />Vote <br /> <br />Follow Up <br /> <br />S:\Council\Lori\2007\Private Roads decision requested 0618 07.doc <br />