Laserfiche WebLink
Revised 2/05 <br />EAW <br />NVIRONMENTALSSESSMENTORKSHEET <br />Note to preparers: This form is available at http://www.eqb.state.mn.us.EAW Guidelines will be <br />available in Spring 1999 at the web site. <br /> The Environmental Assessment Worksheet provides information <br />about a project that may have the potential for significant environmental effects. The EAW is prepared by <br />the Responsible Governmental Unit or its agents to determine whether an Environmental Impact Statement <br />should be prepared. The project proposer must supply any reasonably accessible data for — but should not <br />complete — the final worksheet. If a complete answer does not fit in the space allotted, attach additional <br />sheets as necessary. The complete question as well as the answer must be included if the EAW is prepared <br />electronically. <br />Note to reviewers: <br /> Comments must be submitted to the RGU during the 30-day comment period following <br />notice of the EAW in the EQB Monitor. Comments should address the accuracy and completeness of <br />information, potential impacts that warrant further investigation and the need for an EIS. <br />Project title <br />1. Tiller Corporation Sand and Gravel Mining Operation <br />ProposerRGU <br />2. Tiller Corporation 3. City of Elk River <br /> Contact person Mike Caron Contact person Rebecca Haug <br /> Title Director of Land Use Affairs Title Environmental Administrator <br /> Address PO Box 1480 Address 13065 Orono Parkway <br /> City, state, ZIP Maple Grove, MN 55311-6480 City, state, ZIP Elk River, MN 55330 <br /> Phone 763-425-4191 Phone 763-635-1068 <br /> Fax 763-425-7153 Fax 763-635-1090 <br /> E-mail mikec@tillercorp.com E-mail rhaug@ci.elk-river.mn.us <br />Reason for EAW preparation <br />4. <br />(check one) <br /> ____ EIS scoping X Mandatory EAW ____ Citizen petition ____ RGU discretion <br /> ____Proposer volunteered <br /> If EAW or EIS is mandatory give EQB rule category subpart number 4410.4300 Subpart 12. Item B <br /> and subpart name Non Metallic Mineral Mining. <br />Project location <br />5. County Sherburne City/Township Elk River <br /> NE ¼ SE ¼ Section 21 Township 33 North Range 26 West <br />Attach each of the following to the EAW: <br />County map showing the general location of the project (See attached Figure 1); <br />U.S. Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries <br />(photocopy acceptable); (See attached Figure 2) <br />Site plan showing all significant project and natural features.(See attached Figures 3,4) <br />Description <br />6. <br /> a. Provide a project summary of 50 words or less to be published in the EQB Monitor. <br />The project involves the extraction and processing of aggregates from a 20 acre parcel of property <br />(subject property) adjacent to an existing sand and gravel mining operation. Stripping, extraction, <br />limited processing and reclamation activities will occur on the proposed expansion area. Mining and <br />reclamation of the property will facilitate overall end use grades of the area. <br />b. Give a complete description of the proposed project and related new construction. Attach additional <br />sheets as necessary. Emphasize construction, operation methods and features that will cause physical <br />manipulation of the environment or will produce wastes. Include modifications to existing equipment or <br /> <br />