Laserfiche WebLink
<br />. <br /> <br />Mr. Bill Birrenkott <br />October 12, 1994 <br />Page Two <br /> <br />new 1,000,000 fluted column type of tank. If the Municipal Utilities desires to have a <br />pedestal type spheroid style tank, CBI Na-Con, Inc., would be the lowest and only bidder <br />with a combined bid of $903,500. This is $16,200 more than the fluted column bid of Pitt <br />Des Moines. <br /> <br />Both of these contractors have previously constructed towers in the City of Elk River. CBI <br />Na-Con has recently completed the 500,000 gallon pedestal tower in the Northeast Area, <br />while Pitt Des Moines constructed the 1,000,000 gallon tower located behind the School <br />District office. <br /> <br />We will be in attendance at your October 12 Utilities Commission meeting if you have any <br />questions regarding the bids. <br /> <br />Sincerely, <br /> <br />. <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />T~ <br /> <br />/} <br />~ <br /> <br /> <br />Paul E. Boettcher, P.E. <br /> <br />TJM:tw <br />Attachment <br /> <br />OUl-l20l.oct <br /> <br />. <br />