Laserfiche WebLink
<br />6. <br /> <br />Preparation of plans and specifications and inspection of construction <br />shall be in accordance to the City Standards and all applicable State <br />and Federal regulations. <br /> <br />. <br /> <br />7. The developer would be responsible for applying for and receiving all <br />necessary permits from the regulatory agencies. Proof of receipt of <br />these permits would need to be provided to the City prior to initiating <br />any construction. <br /> <br />NOW, THEREFORE, BE IT FURTHER RESOLVED, that engineering plans, <br />review, inspection, and construction services performed by the City Engineer <br />for the benefit of a development project, be charged the costs associated with <br />those services. <br /> <br />Passed and adopted by the City Council of the City of Elk River this 17th day <br />of October, 1994. <br /> <br />Henry A. Duitsman, Mayor <br /> <br />. <br /> <br />ATTEST: <br /> <br />Sandra A. Thackeray, City Clerk <br /> <br />. <br />