My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.6. SR 10-03-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
10/03/1994
>
7.6. SR 10-03-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:57 AM
Creation date
6/11/2007 1:05:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/3/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />First National Bank <br />September 27, 1994 <br /> <br />Page 4 <br /> <br />---------------------------- <br /> <br />. <br /> <br />D. Sie:nage <br /> <br />1. At this time, the Bank is proposing to utilize wall signage <br />on the building and drive through canopy. Free standing <br />signage is allowed and may be installed upon receiving a <br />sign permit. All signage will need to be provided in <br />conformance with the Elk Park Center Sign <br />Requirements, as outlined in the PUD Agreement. <br /> <br />E. Buildine: and Elevations <br /> <br />1. The building is proposed to be: constructed with a <br />combination of brick, masonry, and a pre-finished copper <br />standing seam metal roof. These materials are consistent <br />with both the main shopping center and the Wendy's <br />facility directly to the north. <br /> <br />F. Drainae:e and Utilities <br /> <br />1. <br /> <br />Issues outlined in Terry Maurer's memo will need to be <br />incorporated and made part of the final plans before <br />issuance of building permit. <br /> <br />. <br /> <br />RECOMMENDATION <br /> <br />It is recommended the Planning Commission recommend approval of <br />the conditional use permit request for site plan review by First <br />National Bank of Elk River to construct a 3,300 square foot bank <br />facility with the following conditions: <br /> <br />1. ALL COMMENTS MENTIONED IN THIS MEMO BE <br />INCORPORATED INTO THE, REVISED PLANS AND <br />SUBMITTED FOR FINAL REVIEW PRIOR TO ISSUANCE OF <br />BUILDING PERMIT. <br /> <br />2. TERRY MAURER'S COMMENTS OUTLINED IN A MEMO <br />DATED SEPTEMBER 22, 1994, BE INCLUDED IN THE <br />REVISED PLANS. <br /> <br />3. <br /> <br />THE ''EXIT ONLY" DRIVE MAY BE DESIGNED AND <br />CONTINUE TO OPERATE WITH LEFT AND RIGHT TURNING <br />MOVEMENTS. HOWEVER, IF IN THE FUTURE INTERNAL <br />STACKING PROBLEMS OR TURNING CONFLICTS OCCUR <br />ON FREEPORT, THE DRIVEWAY WILL NEED TO BE <br />RECONSTRUCTED TO ALLOW RIGHT TURN OUTS ONLY. <br /> <br />. <br /> <br />fIrsthan.pc <br />
The URL can be used to link to this page
Your browser does not support the video tag.